Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

1) BAL-001 Real Power Balancing Control Performance

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
14-05-2024
Written in
2023/2024

1) BAL-001 Real Power Balancing Control Performance

Institution
Course

Content preview

1) BAL-001 Real Power Balancing Control
Performance
Area Control Error (ACE) - CORRECT ANSWER-The instantaneous difference
between a Balancing Authority's Actual Net and Scheduled Net Interchange,
considering the effects of Frequency Bias, and correction for meter error.

Reporting ACE - CORRECT ANSWER-Really it just means the ACE number you
report in MWs, which includes the difference between the Balancing Authority's
Actual Net Interchange and its Scheduled Net Interchange, plus its Frequency
Bias obligation, plus any known meter error.

Regulation Reserve Sharing Group - CORRECT ANSWER-A group whose
members consist of two or more Balancing Authorities that collectively maintain,
allocate, and supply the Regulating Reserve required for all member Balancing
Authorities to use in meeting applicable regulating standards.

Reserve Sharing Group Reporting ACE - CORRECT ANSWER-The sum of the
Reporting ACEs of the Balancing Authorities participating in the Regulation
Reserve Sharing Group.

Control Performance Standard (CPS) - CORRECT ANSWER-The Reliability
Standard that sets the limits of a Balancing Authority's Area Control Error over a
specified time period.

Dynamic Schedule - CORRECT ANSWER-A time-varying energy transfer
updated in Real-time and included in the Scheduled Net Interchange (NIs) term
in the affected Balancing Authorities' control ACE equation.

Inadvertent Interchange - CORRECT ANSWER-The difference between the
Balancing Authority's Actual Net Interchange and Scheduled Net Interchange
(NIa - NIs).

Interconnection Time Monitor - CORRECT ANSWER-The Reliability Coordinator,
designated by the NERC Operating Committee, that monitors Time Error and

, initiates and terminates Timer Error Corrections. There is only one
Interconnection Time Monitor in each Interconnection.

Joint Control - CORRECT ANSWER-Automatic Generation Control of Jointly
owned units by two or more Balancing Authorities.

Overlap Regulation Service - CORRECT ANSWER-A method of providing
regulation service in which the Balancing Authority providing the regulation
service incorporates another Balancing Authority's Actual Net Interchange,
Frequency Response, and schedules into the provided Balancing Authority's
AGC/ACE equation.

Pseudo-tie - CORRECT ANSWER-A time-varying energy transfer that is updated
in Real-time and included in the Actual Net Interchange term in the same manner
as a Tie-line in the affected Balancing Authorities' control ACE equation. (A fake
tie-line)

Tie-lines - CORRECT ANSWER-A circuit connecting two Balancing Authority
Areas.

Time Error - CORRECT ANSWER-The difference between the Interconnection
time measured at the Balancing Authorities and the time specified by the
National Institute of Standards and Technology. Time error is caused by the
accumulation of Frequency Error over a given period.

Time Error Correction - CORRECT ANSWER-An offset to the Interconnection's
scheduled frequency to return the Interconnection's Time Error to a
predetermined value.

Epsilon - Sub one (ε1) - CORRECT ANSWER-A constant derived from the
targeted frequency bound. It is the same for every Balancing Authority Area
within an Interconnection and is the limit for determining a Balancing Authority's
compliance with CPS1.

Automatic Time Error Correction (ATEC) - CORRECT ANSWER-A component of
ACE (only done in the Western Interconnection) that modifies the control point for

Written for

Course

Document information

Uploaded on
May 14, 2024
Number of pages
6
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
lizunitedstates Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
5125
Member since
2 year
Number of followers
11
Documents
21511
Last sold
2 weeks ago

4.5

299 reviews

5
198
4
76
3
17
2
5
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions