Answers.
Which of the following equipment may NOT be required for a pressure test?
Internal line up clamps
Before testing begins, a _____________ with explanatory notes and data should be prepared.
Pressure test procedure
The pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelines
should be performed in accordance with:
ASME, Code of Federal Regulations and any other applicable governmental regulations.
Before the actual line filling operation, it is advisable to run a ___________ in an effort to identify
geometric abnormalities that may exist in the line prior to the test.
Sizing pig, caliper or deformation tool
Personnel conducting a pressure test should keep:
Complete record of the test, including details of the test operation and events such as weather
variations, test failures, bleed offs, repressurizations, and so forth
According to API 1169, an inspector is an individual qualified to monitor, assess, evaluate, verify,
discuss, decide, resolve, report, and document pipeline construction activities to ensure the
requirements of the design, drawings, specifications, regulations, and industry practices are being met
safely, efficiently, and in an environmentally sound manner
True
Quality assurance includes those activities focused on providing confidence that quality requirements
are considered fulfilled
True
Inspectors are not empowered and expected to shut down any work on the basis of, but not limited
to situations or activities that have occurred, are occurring, or may occur that could result in:
Work schedule of the contractor
Inspection personnel are expected to interact with representatives of newspapers, TV, or other media
seeking information
False
Inspectors should evaluate the following areas to avoid incidents and raise awareness of hazards,
except:
Traffic congestion
Inspectors should evaluate the following areas to avoid incidents and raise awareness of hazards at:
Job site, site specific hazards, climatic of other work condition hazards
, According to API, calibration is a comparison to a standard of known accuracy and making any needed
adjustments
True
Person or group of people who directs and controls all or part of a facility, location, department, or
other function; has the fiscal responsibility for the organization, and is accountable for ensuring
compliance with legal and other applicable requirements is known as:
Management
Regarding training and awareness, the organization shall:
1. Provide for quality management system training and job training AND
2. Maintain appropriate records of education, training, skills, and experience
The quality management system documentation shall include the following, except for:
All federally required processes regarding the project at hand
Regarding design and development review, at suitable stages, review(s) shall be performed:
1. To evaluate the suitability, adequacy, and effectiveness of the results of design and development
stages to meet specified requirements AND
2. To identify any problems and propose necessary actions
The contingency plan shall include the following, at minimum:
1. Actions required in response to significant risk scenarios to mitigate effects of disruptive incidents,
2. Identification and assignment of responsibilities and authorities, 3. Infernal and external
communication controls
Where arc welding is regularly carried out, adjacent walls and other surfaces have:
Low reflectivity to ultraviolet radiation
When using cleaning compounds prior to welding, ________ instructions shall be followed
Manufacturers
Fire watches shall be posted where welding or cutting is done and where a large fire might develop, or
whenever any of the following conditions exist:
1. Proximity of combustibles
2. Openings
3. Metal walls and pipes
Cylinders of liquified gases shall not be charged to more than ______ the maximum capacity by
weight or pressure.
1/2
Unconnected cylinders shall be stored in an approved storage area, preferably indoors, but not near a
building entrance
False