API 1169 INGAA Defs Exam Questions and Answers 100% Correct
API 1169 INGAA Defs Exam Questions and Answers 100% Correct Active Excavation Area - Answer- is the area where the edge of the disturbance is within 25 feet of the centerline of existing facilities. Crossing Agreement - Answer- is the agreement entered into between the Owner of the existing facility and Crossing Company installing the new facility to specify the rights and obligations of the parties during the Crossing Construction. Crossing Angle - Answer- is the angle measured between the existing pipeline and the proposed location of pipe and is recommended to be as close to perpendicular as practical (e.g. between 45 and 90 degrees). Crossing Clearance Distance - Answer- is the vertical separation between the existing pipeline facilities and where the new pipeline is being installed. The recommended crossing clearance distance between the new pipeline and the existing facilities is two feet (24 inches). The minimum distance is one foot (12 inches). Crossing Company - Answer- is the entity that intends to install, operate and maintain a new pipeline that crosses existing pipeline facilities. The Crossing Company may designate a third party or parties to perform the tasks necessary to accomplish a crossing but remains responsible for the work performed by such third parties
Written for
- Institution
- API 1169
- Course
- API 1169
Document information
- Uploaded on
- May 18, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
api 1169 ingaa defs exam questions and answers 100
Also available in package deal