API 1169 Exam Questions and Answers 100% Correct
API 1169 Exam Questions and Answers 100% Correct Which of the following equipment may NOT be required for a pressure test? - Answer- internal line clamps before testing begins, a ________ with explanatory notes and data should be prepared - Answer- pressure test procedure the pressure testing of newly constructed liquid pipelines and replaced segments of existing pipelinesshould be performed in accordance with - Answer- ASME B31.4, 49 Code of Federal Regulations, Part 195 and any other applicable governmental regulations. Before the actual line filling operation, it is advisable to run a _________ in an effort to identify any geometric abnormalities that may exist in the line prior to the test - Answer- Sizing pig, caliper or deformation tool Personnel conducting a pressure test should keep: - Answer- Complete record of the test, including details of the test operation and events such as weather variations, test failures, bleedoffs, repressurizations, and so forth According to API 1169 an INSPECTOR is an individual qualified to monitor, assess, evaluate, verify, discuss, decide, resolve, report, and document pipeline construction activities to ensure the requirements of the design, drawings, specifications, regulations, and industry practices are being met safely, efficiently, and in an environmentally sound manner. - Answer- true Quality Assurance includes those activities focused on providing confidence that quality requirements are consistently fulfilled - Answer- true Inspectors are NOT empowered and expected to shut down any work on the basis of, but not limited to situations or activities that have occurred, are occurring, or may occur that could result in: - Answer- work schedule of the contractor Inspection Personnel are expected to interact with representatives of newspapers, TV, or other media seeking information - Answer- false Inspectors should evaluate the following areas to avoid incidents and raise awareness of hazards, except: - Answer- Traffic Congestion - at the local Walmart when a sale is in progress According to API, Q1, Specification for Quality Programs, calibration is a comparison to a standard of known accuracy and making any needed adjustments. - Answer- true According to API, Q1, Specification for Quality Programs, calibration is a comparison to a standard of known accuracy and making any needed adjustments. - Answer- management Regarding training and awareness, the organization shall: - Ans
Written for
- Institution
- API 1169
- Course
- API 1169
Document information
- Uploaded on
- May 18, 2024
- Number of pages
- 22
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
api 1169 exam questions and answers 100 correct