SAGA TEST 5 2024 WITH 100% CORRECT ANSWERS
SAGA TEST 5 2024 WITH 100% CORRECT ANSWERS Accountability report - Answer- 13 Week Report These are contained in both the Work Center PMS Manual and the Command Master PMS manual. - Answer- Maintenance Index Pages (MIPs) Who's responsibility is the planning and scheduling of preventative maintenance? - Answer- The DIVO and Work Center Supervisor LOEP - FR - Answer- Force Revision Date LOEP produced - Answer- Report Date TYCOM - Answer- Type Commander Ships hull number, Unit Identification Code(UIC) - Answer- UNIT Listing of Work Centers within each department. - Answer- Work Center MIP - Answer- Maintenance Index Page Number EGL - Answer- Equipment Guide List MRS - Answer- Maintenance Requirement Sunstantiated NIR - Answer- No Individual Requirement NMR - Answer- No Maintenance Requirement LATD - Answer- Lacks Adequate Technical Data How long is a quarter in SKED? - Answer- 13 Weeks Who can allow different tools for use in preventative maintenance. - Answer- Work Center Supervisor What has tools needed for maintenance. - Answer- MRC Supports the 3-M programs, policies, and procedures for the fleet. It is one of the omptimized applications on NTCSS. - Answer- Organizational Maintenance Management System - Next Generation(OMMS-NG) These maintenance actions are the minimum requirements to maintain equipment in a fully operational state. - Answer- PMS What provides comprehensive procedures developed in accord
Written for
- Institution
- SAGA
- Course
- SAGA
Document information
- Uploaded on
- May 20, 2024
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
saga test 5 2024 with 100 correct answers