HVAC KY598 JOURNEYMAN EXAM PREP QUESTIONS AND VERIFIED CORRECT ANSWERS GRADED A+ Soldering on a metal portion of a hydronic piping system shall be performed a minimum of ________ inches from any plastic to metal adapter in the same water line. 18 Where gas piping is required to be installed in conduit and one end terminates outdoors, the conduit must extend not less than ________ inches outside the building. 4 Domestic clothes dryer exhaust ducts shall be constructed of metal not less than _______ inch thick. 0.019 Energy recovery ventilation systems shall be provided with means of access to the heat exchanger as required for service, maintenance, repair, or ________. replacement On a roof with a 4/12 slope, an 8-inch diameter Type B vent located 12 feet from a vertical wall shall terminate a minimum of _______ inches above the roof. 12 What type of cooling system does not need a compressor for the refrigerant flow? Absorption Catwalks installed to provide the required rooftop equipment access shall be a minimum of _____ inches above the roof. 24 Required field tests of refrigerant containing parts may be performed with _______ or _________. nitrogen, carbon dioxide Chapter 4 of the International Mechanical Code governs ventilation within buildings intended to be occupied, but not applicable to _______. smoke control systems For an open type hot water expansion tank, an overflow with a minimum of ________ inch(es) shall be installed at the top of the tank. 1 What would the amp draw be for a 120v AC electric motor with 10 ohms resistance? 12 amps Gas vents terminating less than 8 feet from a vertical wall shall terminate not less than ______ feet above any portion of a building within 10 feet. 2 Factory built barbeque appliances shall be of an approved type and installed in accordance with the International _______ Code.

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

HVAC KY598 JOURNEYMAN EXAM PREP QUESTIONS AND

VERIFIED CORRECT ANSWERS GRADED A+


Soldering on a metal portion of a hydronic piping system shall be performed a

minimum of ________ inches from any plastic to metal adapter in the same water

line.

18

Where gas piping is required to be installed in conduit and one end terminates

outdoors, the conduit must extend not less than ________ inches outside the

building.

4

Domestic clothes dryer exhaust ducts shall be constructed of metal not less than

_______ inch thick.

0.019

Energy recovery ventilation systems shall be provided with means of access to

the heat exchanger as required for service, maintenance, repair, or ________.

replacement

On a roof with a 4/12 slope, an 8-inch diameter Type B vent located 12 feet from a

vertical wall shall terminate a minimum of _______ inches above the roof.

12

What type of cooling system does not need a compressor for the refrigerant

flow?

,Absorption

Catwalks installed to provide the required rooftop equipment access shall be a

minimum of _____ inches above the roof.

24

Required field tests of refrigerant containing parts may be performed with

_______ or _________.

nitrogen, carbon dioxide

Chapter 4 of the International Mechanical Code governs ventilation within

buildings intended to be occupied, but not applicable to _______.

smoke control systems

For an open type hot water expansion tank, an overflow with a minimum of

________ inch(es) shall be installed at the top of the tank.

1

What would the amp draw be for a 120v AC electric motor with 10 ohms

resistance?

12 amps

Gas vents terminating less than 8 feet from a vertical wall shall terminate not less

than ______ feet above any portion of a building within 10 feet.

2

Factory built barbeque appliances shall be of an approved type and installed in

accordance with the International _______ Code.

Fuel gas

, In dry-cleaning rooms, the exhaust system for a Type 2 dry cleaning system shall

be designed to provide an exhaust air flow rate of _______ cfm per square foot of

floor area.

1

Where other approved means of controlling condensation is not provided, the

_______ of attics or structural spaces used as a part of a passive solar system is

required.

ventilation

Ventilation air shall not be recirculated from one dwelling to another or to

_________ occupancies.

dissimilar

Heat exchangers for solar energy systems shall have adequate protection to

insure that the potable aspect of the water supply and distribution system is

______.

properly safeguarded

Steel pipe used in a fuel oil piping system shall be supported horizontally a

maximum of ________ feet.

12

When serving a Type 1 hood, a grease duct penetrates a ceiling shall have a

minimum clearance of _______ inches from gypsum wallboard.

6

The operating mechanism for an opening providing natural ventilation shall be

controllable by ________.

Geschreven voor

Vak

Documentinformatie

Geüpload op
29 mei 2024
Aantal pagina's
17
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.29
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TopGradeSolutions Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
95
Lid sinds
2 jaar
Aantal volgers
9
Documenten
13297
Laatst verkocht
5 dagen geleden
TOPGRADESOLUTIONS

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lees meer Lees minder
4.9

171 beoordelingen

5
159
4
7
3
4
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen