High Boiler License Pressure Steam NYC Test Exam Questions and Answers 2024
High Boiler License Pressure Steam NYC Test Exam Questions and Answers 2024 The minimum blowdown for a spring loaded safety valve shall be of what percent of the set pressure ? - CORRECT ANSWER-10 % How is the Main Steam pressure gages tested ? - CORRECT ANSWER-With an Inspectors Gage Who is in charge of the code for any plumbing installations - CORRECT ANSWER-NYC Plumbing Code When will anchorage or guides be inspected ? - CORRECT ANSWER-Annually How many brass washout plugs does a miniature boiler have - CORRECT ANSWER-3 Brass Washout Plugs 1 " in size How often is Hp piping expansion joints inspected ? - CORRECT ANSWER-Weekly How long should a Hydronic System be pressure tested for ? - CORRECT ANSWER-2 hours at no less than 100 PSIG How is a gage protected from excessive pressure ? - CORRECT ANSWER-Shut off Cock Who is authorized to witnessing a test on a gas piping system ? - CORRECT ANSWERPlumbing Inspector Architect Licensed PE Master Plumber or Agency by the D.O.B How should a remote disconnect be labeled ? - CORRECT ANSWER-Remote control for burner When is a fusible plug not needed to be installed on a boiler ? - CORRECT ANSWER-: Over 200 Psig When shall power boiler with a MAWP over 400 be tested - CORRECT ANSWERPressure tested annually What shall a Design plan of a boiler and application contains but not limited to ? - CORRECT ANSWER-Size Location Operating Pres
Written for
- Institution
- NYC
- Course
- NYC
Document information
- Uploaded on
- May 30, 2024
- Number of pages
- 17
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
high boiler license pressure steam nyc test exam
-
the minimum blowdown for a spring loaded safety va
-
how is the main steam pressure gages tested