Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Samenvatting

MRO business summary

Beoordeling
-
Verkocht
4
Pagina's
8
Geüpload op
09-06-2019
Geschreven in
2018/2019

Samenvatting voor tentamen MRO business in blok 8. Alle hoorcolleges zijn samengevat (dia's en uitleg)

Instelling
Vak

Voorbeeld van de inhoud

MRO Business summary
Week 1
Lecture 1.1: Gasturbine maintenance (KLM)

Continuous Airworthiness Maintenance Program (CAMP):
- All maintenance is based on the CAMP, this program defines per aircraft the
maintenance requirements
- References such as Part-M, Part-145 etc…
- The maintenance organisation is described in the Maintenance Organization
Exposition (MOE)
- For KLM several authorities are important (EASA, FAA, CAA,….)
- Training of staff is performed in accordance with EASA Part-66 for certifying staff
- Quality Assurance and Control organization provides independent supervision and
monitoring of quality control, recognition and authorizations

Maintenance concepts:
- On condition
o Monitoring the aircraft and engine performance at regular intervals and
determining when and which maintenance is required based on the condition
o Engine inspections include: borescope gas path, oil checks, visual
inspections, functional checks
- Hard time
o Base on predetermined hard times to remove components (scheduled
maintenance)
• Objective: minimize any operational disruption
o Disadvantage: loss of any usable operational remaining life
- Thresholds: counters to determine a required step in maintenance (expressed in FH,
FC)

Engine shop maintenance:
- Engine shop maintenance is described in Workscope Planning Guide (WPG)
- Engine removal reasons:
o Replacements of hard time components (LLPs)
o Performance deterioration (EGT margin)
o Oil leakage
o Damage to gas path
o Other findings during regular (visual) inspections
- After engine removal:

Incoming inspection → determining workscope → meeting to discuss/finalize workscope
→ bill of work is finalized, agreed and released → engine is inducted in the disassembly
process

- Workscope:
o Hospital repairs (repair workscope)
o Shopvisit workscope levels:
• Overhaul
• Performance
• Minimum
- After engine removal, an immediate replacement engine is required, a/c is not put on
hold for engine repair!

, MRO Business summary
Reliability metrics
- Expressed in:
o Shopvisit rate (n.o. of shopvisits per 1000 engine FH)
o In Flight shutdown rate (n.o. of engine shutdown per 1000 FH)
o Aborted T.O. rate (n.o. of aborted take offs per 1000 departures)

- Key performance indicators
o Turn Around Time (TAT of engine shopvisit)
o Maintenance costs
o Quality

Lecture 1.2: Leasing and contracts

Contract: a formal agreement between 2 or more parties which are written and enforceable
by law
- The existence of a contract requires: an offer, acceptance of that offer, promise to
adhere to the terms, payment consideration, a fixed time, terms and condition for
failures & audit

Types of lease:
- Dry lease
o Lessor provides an a/c to the lessee (airline) without insurance, crew etc.
o Aircraft mist be registered under the airline’s Air Operator Certificate (AOC)
- Wet lease
o Lessor provides an aircraft to lessee complete with insurance (ACMI), crew,
maintenance etc.
o Generally shorter durations
- Damp(moist) lease
o Short term legal contractual arrangement where the lessor provides the
aircraft, cockpit crew, maintenance engineer for CRS, without cabin crew
- Financial lease
o Business form of leasing whereby the lessor retains the asset, thus leaving
the lesse with capital (for other investments)
o At the end-of-lease, the aircraft and ownership stays with the lessee
- Operational lease
o Lessee just pay a monthly rental plus maintenance reserves (for scheduled
maintenance) based upon operational usage
o Lessor keeps the aircraft on their balance sheet

ADVANTAGES DISADVANTAGES
BUY Asset control Investment requirements
Acquires equity Residual value risk
Tax benefits Loan covenants
Financial attractive Less fleet flexibility
LEASE Reduced investment Lease rate fluctuations
Fleet flexibility Lease contract constraints
No asset risk Other lease costs/taxes
Minimal financial impact No equity for airline

Geschreven voor

Instelling
Studie
Vak

Documentinformatie

Geüpload op
9 juni 2019
Aantal pagina's
8
Geschreven in
2018/2019
Type
SAMENVATTING

Onderwerpen

$7.77
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
tob99
5.0
(1)

Maak kennis met de verkoper

Seller avatar
tob99 Hogeschool van Amsterdam
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
8
Lid sinds
8 jaar
Aantal volgers
7
Documenten
3
Laatst verkocht
2 jaar geleden

5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen