Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACI Concrete Field-Testing Technician - Grade 1 Exam Review 100% Correct Answers Verified Latest 2024 Version

Beoordeling
-
Verkocht
-
Pagina's
43
Cijfer
A+
Geüpload op
06-06-2024
Geschreven in
2023/2024

ACI Concrete Field-Testing Technician - Grade 1 Exam Review | 100% Correct Answers | Verified | Latest 2024 Version Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample. A. True B. False - B. False ASTM C172 -Para (4.1.2) - Start molding. specimens for strength tests within 15 min after fabricating the composite sample. Q2. The maximum allowable time between obtaining the first and last portions of the composite sample may not exceed 5 minutes. A. True B. False - B. False ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining the first and final portions of the composite sample. Q3. The composite concrete sample must be protected from sun, wind, contamination and rapid evaporation. A. True B. False - A. True ASTM C172 - Para (4.1.2)Q4. If the concrete contains aggregates larger than those that are appropriate for a size of mold or equipment used, the sample should be wet sieved before making the test. A. True B. False - A. True ASTM C172- Para (6.1) Q5. The composite sample should not be remixed before beginning any tests. A. True B. False - B. False ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the minimum amount necessary to ensure uniformity and compliance with the maximum time limits Q6. Sampling should normally be performed, as the concrete is discharged from the mixer. A. True B. False - B. False ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the concrete is delivered from the mixer. To the conveying vehicle used to transport the concrete to the forms; however, specifications may require other points of sampling, such as the discharge of a concrete pump.Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators, and non-agitating equipment. A. True B. False - A. True ASTM C172- Para (1.1) Q8. After sampling is completed, start the tests for slump and air content within: A. 2 ½ minutes B. 10 minutes C. 15 minutes D. None of the above - D. None of the above ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5 min after obtaining the final portion of the composite sample. Q9. In any case, do not obtain samples until: A. All the water and admixtures have been added to the concrete B. 200 revolutions of the drum have been obtained C. ½ of the water has been added D. None of the above - A. All the water and admixtures have been added to the concrete. ASTM C172- Para (5.2.3). In any case do not obtain samples until after all of the water has been added to the mixer. Q10. No samples shall be taken before_________ or after_________ of the batch has bee

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

ACI Concrete Field-Testing Technician -
Grade 1 Exam Review | 100% Correct
Answers | Verified | Latest 2024 Version
Q1. Start molding specimens for strength tests within 30 minutes after fabricating the composite sample.



A. True

B. False - ✔✔B. False



ASTM C172 -Para (4.1.2) - Start molding.

specimens for strength tests within 15 min after fabricating the

composite sample.



Q2. The maximum allowable time between obtaining the first and last portions of the composite sample
may not exceed 5 minutes.



A. True

B. False - ✔✔B. False



ASTM C172 - Para (4.1)- The elapsed time shall not exceed 15 min. between obtaining the first and final
portions of the composite sample.



Q3. The composite concrete sample must be protected from sun, wind, contamination and rapid
evaporation.



A. True

B. False - ✔✔A. True



ASTM C172 - Para (4.1.2)

,Q4. If the concrete contains aggregates larger than those that are appropriate for a size of mold or
equipment used, the sample should be wet sieved before making the test.



A. True

B. False - ✔✔A. True



ASTM C172- Para (6.1)



Q5. The composite sample should not be remixed before beginning any tests.



A. True

B. False - ✔✔B. False



ASTM C172-Para (4.1.1) -The sample shall be combined and remixed with a shovel the minimum amount
necessary to ensure uniformity and compliance with the maximum time limits



Q6. Sampling should normally be performed, as the concrete is discharged from the mixer.



A. True

B. False - ✔✔B. False



ASTM C172-Para (5). NOTE 2—Sampling should normally be performed as the concrete is delivered from
the mixer.



To the conveying vehicle used to transport the

concrete to the forms; however, specifications may require other points of sampling, such as the
discharge of a concrete pump.

,Q7. ASTM Method C172 includes sampling from stationary mixers, paving mixers, truck mixers, agitators,
and non-agitating equipment.



A. True

B. False - ✔✔A. True



ASTM C172- Para (1.1)



Q8. After sampling is completed, start the tests for slump and air content within:



A. 2 ½ minutes

B. 10 minutes

C. 15 minutes

D. None of the above - ✔✔D. None of the above



ASTM C172- Para (4.1.2) Start tests for slump, temperature, and air content within 5 min after obtaining
the final portion of the composite sample.



Q9. In any case, do not obtain samples until:



A. All the water and admixtures have been added to the concrete

B. 200 revolutions of the drum have been obtained

C. ½ of the water has been added

D. None of the above - ✔✔A. All the water and admixtures have been added to the concrete.



ASTM C172- Para (5.2.3). In any case do not obtain samples until after all of the water has been added to
the mixer.



Q10. No samples shall be taken before_________ or after_________ of the batch has been discharged.

, A. 10% or after 90%

B. 20% or after 90%

C. 20% or after 80%

D. None of the above - ✔✔A. 10% or after 90%



ASTM C172- Para (5.2.1).



NOTE 3—No samples should be taken before 10 % or after 90 % of the batch has been discharged.



Due to the difficulty of determining the actual quantity of concrete discharged, the intent is to provide
samples that are representative of widely separated portions, but not the beginning and the end of the
load.



Q11. When strength tests are to be made, the minimum size of the composite sample shall be:



A. ¼ cubic foot

B. 1 cubic foot

C. Any convenient size

D. 1 Wheelbarrow - ✔✔B. 1 cubic foot



ASTM C172- Para (5.1).



Make the samples to be used for strength tests a minimum of 28 L (1 ft3).



Q12. Sample the concrete from the chute of a truck mixer by:



A. Raising chute to stop the flow and scoop concrete from there into the slump cone and cylinder molds

B. Passing a receptacle completely through the discharge steam or by completely diverting the discharge
into the sample container

C. Holding a shovel in the flow and direct half into a bucket

Geschreven voor

Vak

Documentinformatie

Geüpload op
6 juni 2024
Aantal pagina's
43
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$9.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
hov
1.0
(2)

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
hov State University Of West Georgia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
3
Documenten
2125
Laatst verkocht
2 maanden geleden
Academic Avengers

Expert Verified Exams {Latest Versions} 99% Pass Rate

1.0

2 beoordelingen

5
0
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen