Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

ACI Certification- Concrete Field-Testing Technician Grade 1 CP-1 (12) 100% Correct Answers Verified Latest 2024 Version

Beoordeling
-
Verkocht
-
Pagina's
16
Cijfer
A+
Geüpload op
06-06-2024
Geschreven in
2023/2024

ACI Certification- Concrete Field-Testing Technician Grade 1 CP-1 (12) 100% Correct Answers | Verified | Latest 2024 Version The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or whenever there is a question of ______ . - Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - True The temperature of concrete may be measured in a wall form. True or False? - True What must be done to the sample container prior to sampling the concrete? - Dampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete? - Close off air voids by gently pressing the concrete around the device How long must the temperature measuring device remain in the freshly mixed concrete? - minimum of two minutes, maximum of five minutes The temperature of the concrete is reported to the nearest ______ °F - 1 degree A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - FalseASTM C172 - Standard Practice for Sampling Freshly Mixed Concrete Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Compliance This method covers sampling from four types of mixers, which are _____ , _____ , _____ , and _____ . - Stationary mixers, paving mixers, revolving drum mixers and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - 15 Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. True or False? - True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - 15 The concrete sample must be protected from contamination and _____. - Rapid evaporation The minimum size sample for making strength test specimens is _____. - 1 cubic foot When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch. - 2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - 5When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of the batch. - 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - False The composite sample from a truck mixer must be obtained from the _____ portion of the batch. - middleACI Certification- Concrete Field-Testing Technician Grade 1 CP-1 (12) 100% Correct Answers | Verified | Latest 2024 Version The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into the freshly mixed concrete. - 3" The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to ± ______ °F throughout a range of ____________. - 1 degree, 30 degrees to 120 degrees The temperature measuring device shall be calibrated ______ , or whenever there is a question of ______ . - Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - True The temperature of concrete may be measured in a wall form. True or False? - True What must be done to the sample container prior to sampling the concrete? - Dampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete? - Close off air voids by gently pressing the concrete around the device How long must the temperature measuring device remain in the freshly mixed concrete? - minimum of two minutes, maximum of five minutes The temperature of the concrete is reported to the nearest ______ °F - 1 degree A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - FalseASTM C172 - Standard Practice for Sampling Freshly Mixed Concrete Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Compliance This method covers sampling from four types of mixers, which are _____ , _____ , _____ , and _____ . - Stationary mixers, paving mixers, revolving drum mixers and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - 15 Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. True or False? - True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - 15 The concrete sample must be protected from contamination and _____. - Rapid evaporation The minimum size sample for making strength test specimens is _____. - 1 cubic foot When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch. - 2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - 5When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of the batch. - 2 Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - False The composite sample from a truck mixer must be obtained from the _____ portion of the batch. - middle

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

ACI Certification- Concrete Field-Testing Technician
Grade 1 CP-1 (12) 100% Correct Answers | Verified |
Latest 2024 Version

The sensor of the temperature measuring device shall be submerged a minimum of ______ inches into
the freshly mixed concrete. - ✔✔3"



The temperature measuring device shall have a capacity of measuring temperature of freshly mixed
concrete to ± ______ °F throughout a range of ____________. - ✔✔1 degree, 30 degrees to 120 degrees



The temperature measuring device shall be calibrated ______ , or whenever there is a question of
______ . - ✔✔Annually, accuracy



The temperature of concrete may be measured in a wheelbarrow. True or False? - ✔✔True



The temperature of concrete may be measured in a wall form. True or False? - ✔✔True



What must be done to the sample container prior to sampling the concrete? - ✔✔Dampen with water



What must be done to the concrete surrounding the temperature measuring device after the device is
submerged in the fresh concrete? - ✔✔Close off air voids by gently pressing the concrete around the
device



How long must the temperature measuring device remain in the freshly mixed concrete? - ✔✔minimum
of two minutes, maximum of five minutes



The temperature of the concrete is reported to the nearest ______ °F - ✔✔1 degree



A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - ✔✔False

,ASTM C172 - ✔✔Standard Practice for Sampling Freshly Mixed Concrete



Sampling by this method is required when tests are to be made to determine _____ with specification
requirements. - ✔✔Compliance



This method covers sampling from four types of mixers, which are _____ , _____ , _____ , and _____ . -
✔✔Stationary mixers, paving mixers, revolving drum mixers and open top mixers



The maximum allowable time between obtaining the first and final portions of a composite sample is
_____ minutes. - ✔✔15



Portions of a composite sample shall be thoroughly remixed before beginning tests on the sample. True
or False? - ✔✔True



The maximum elapsed time allowed between obtaining the final portion of the composite sample and
beginning the tests for slump, temperature, and air content is _____ minutes. - ✔✔5



The molding of strength test specimens shall begin within _____ minutes after fabricating the composite

sample. - ✔✔15



The concrete sample must be protected from contamination and _____. - ✔✔Rapid evaporation



The minimum size sample for making strength test specimens is _____. - ✔✔1 cubic foot



When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced
intervals during discharge of the middle portion of the batch. - ✔✔2



The composite sample for a paving mixer must represent a minimum of _____ different portions of the
batch of concrete taken from the pile after discharge. - ✔✔5

, When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____
regularly spaced intervals during discharge of the middle portion of the batch. - ✔✔2



Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the
mixer at the job site. True or False? - ✔✔False



The composite sample from a truck mixer must be obtained from the _____ portion of the batch. -
✔✔middle



When the concrete contains aggregate larger than that permitted for a particular test method, the
sample of concrete must be _____ _____ before making the test. - ✔✔wet sieved



What must occur before a sample of concrete can be taken from a revolving drum mixer? (Oral Exam) -
✔✔All of the water must be added to the mixer



Describe the different procedures that can be used to collect a sample of concrete from a stationary or
revolving drum mixer. (Oral Exam) - ✔✔Repeatedly pass a receptacle through the entire discharge
stream, Completely divert the discharge stream into a sample container



What are the required steps for collecting a sample of concrete from a stationary or revolving drum
mixer? (Oral Exam) - ✔✔Collect two or more portions of concrete, Take the portions at regularly spaced
intervals, Take the portions from the middle of the batch



Describe the procedure for collecting a sample of pavement concrete deposited on grade. (Oral Exam) -
✔✔Discharge the contents of the paving mixer, Obtain samples from at least five different portions of
the pile



What is the minimum size for a sample when strength test specimens are to be molded? (Oral Exam) -
✔✔1 cubic foot (28 L)



What is the maximum allowable time between obtaining the first and final portions of the composite
sample? (Oral Exam) - ✔✔15 min.

Geschreven voor

Vak

Documentinformatie

Geüpload op
6 juni 2024
Aantal pagina's
16
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$9.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
hov
1.0
(2)

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
hov State University Of West Georgia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
3
Documenten
2125
Laatst verkocht
2 maanden geleden
Academic Avengers

Expert Verified Exams {Latest Versions} 99% Pass Rate

1.0

2 beoordelingen

5
0
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen