Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

APMP Foundation Exam 2024 Questions & Answers 100% Correct Verified

Beoordeling
-
Verkocht
-
Pagina's
31
Cijfer
A+
Geüpload op
10-06-2024
Geschreven in
2023/2024

APMP Foundation Exam | 2024 Questions & Answers | 100% Correct | Verified Q.1 A kick-off meeting is ... needed only if the team is distributed over several locations only for those who provide content only for top management members a meeting where all stakeholders are invited. - a meeting where all stakeholders are invited. Q.2 Which of the following guidelines is generally seen as best practice? Allow 30-40% of total time for final review, amendment and production Allow 15% of total time for start-up and planning Schedule 20% contingency time Allow 10-20% of total time for kick-off preparation and proposal strategy review (earlier called the pink review) - Allow 15% of total time for start-up and planning Q.3 Which is correct? The Win Rate is the value ($) of the bids submitted, divided by the value ($) of the bids wonThe Capture Ratio is the number of bids won, divided by the $ value of the bids submitted The Capture Ratio is the value ($) of the bids submitted, divided by the number of bids won The Win Rate is the number of bids won, divided by the number of bids submitted - The Win Rate is the number of bids won, divided by the number of bids submitted Q.4 To produce a complex graphic, it typically needs 20 minutes each 1 hour each 2—6 hours each 1 day each - 2—6 hours each Q.5 Which of the following elements are typically NOT found in a proposal cost budget? Facilities Bid production costs Contributors Advertising - Advertising Q.6 According to best practice, how much time should you allocate for final review, amendment, and production?Less than 10% of the available time 10-20% of the available time 20-30% of the available time 40-50% of the available time - 10-20% of the available time Q.7 Which of the following statements is correct? The Business Case Review is before the Kick-Off Meeting The Kick-Off Meeting is before the Proposal Strategy Review (also called Storyboard Review or Content Plan Review)) The Final Document Review is after bid submission The Opportunity Plan Review (earlier called Strategy Review, or Blue Review) is after the Kick-Off Meeting - The Kick-Off Meeting is before the Proposal Strategy Review (also called Storyboard Review or Content Plan Review)) Q.8 What is the right planning sequence? Market Identification after Opportunity Assessment Opportunity Planning before Proposal Planning before Proposal Preparation Opportunity Planning after Opportunity Assessment

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

APMP Foundation Exam | 2024 Questions &
Answers | 100% Correct | Verified
Q.1 A kick-off meeting is ...



needed only if the team is distributed over several locations



only for those who provide content



only for top management members



a meeting where all stakeholders are invited. - ✔✔a meeting where all stakeholders are invited.



Q.2 Which of the following guidelines is generally seen as best practice?



Allow 30-40% of total time for final review, amendment and production



Allow 15% of total time for start-up and planning



Schedule 20% contingency time



Allow 10-20% of total time for kick-off preparation and proposal strategy review (earlier called the pink

review) - ✔✔Allow 15% of total time for start-up and planning



Q.3 Which is correct?



The Win Rate is the value ($) of the bids submitted, divided by the value ($) of the bids won

,The Capture Ratio is the number of bids won, divided by the $ value of the bids submitted



The Capture Ratio is the value ($) of the bids submitted, divided by the number of bids won



The Win Rate is the number of bids won, divided by the number of bids submitted - ✔✔The Win Rate is
the number of bids won, divided by the number of bids submitted



Q.4 To produce a complex graphic, it typically needs



20 minutes each



1 hour each



2—6 hours each



1 day each - ✔✔2—6 hours each



Q.5 Which of the following elements are typically NOT found in a proposal cost budget?



Facilities



Bid production costs



Contributors



Advertising - ✔✔Advertising



Q.6 According to best practice, how much time should you allocate for final review, amendment, and
production?

,Less than 10% of the available time



10-20% of the available time



20-30% of the available time



40-50% of the available time - ✔✔10-20% of the available time



Q.7 Which of the following statements is correct?



The Business Case Review is before the Kick-Off Meeting



The Kick-Off Meeting is before the Proposal Strategy Review (also called Storyboard Review or Content
Plan Review))



The Final Document Review is after bid submission



The Opportunity Plan Review (earlier called Strategy Review, or Blue Review) is after the Kick-Off
Meeting - ✔✔The Kick-Off Meeting is before the Proposal Strategy Review (also called Storyboard
Review or Content Plan Review))



Q.8 What is the right planning sequence?



Market Identification after Opportunity Assessment



Opportunity Planning before Proposal Planning before Proposal Preparation



Opportunity Planning after Opportunity Assessment

, None of the above - ✔✔Opportunity Planning before Proposal Planning before Proposal Preparation



Q.9 How much time do you calculate for contingency, Final Document Review, amendment, and
production?



20-30%



30-40%



5%



10% - ✔✔20-30%



Q.10 A good proposal development process should always ...



Be documented in Microsoft Visio



Be designed in a way that no training is needed



Be "owned" by one person



Contain no parallel tasks - ✔✔Be "owned" by one person



Q.11 As the kick-off meeting organizer, which of the following would you NOT do?



Invite Final Document Reviewers



Develop Content Plan during the kick-off meeting

Geschreven voor

Vak

Documentinformatie

Geüpload op
10 juni 2024
Aantal pagina's
31
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
hov
1.0
(2)

Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
hov State University Of West Georgia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
3
Documenten
2125
Laatst verkocht
2 maanden geleden
Academic Avengers

Expert Verified Exams {Latest Versions} 99% Pass Rate

1.0

2 beoordelingen

5
0
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen