1. Overhead cranes with more than one hoisting
unit shall have? Its rated load marked on it.
2. How often does O.S.H.A. require a written wire
rope inspection? Once a month
3. What is the purpose of the "E" (Emergency) stop on
an overhead crane? Removes power to entire crane.
4. Most loads should be rigged to within how many
degrees of level? 5
5. According to ASME B30.2, what is the safety
factor for rigging? 5 to 1
6. According to O.S.H.A. frequent inspections
shall be performed? Daily to monthly
7. According to ASME B30.2 a frequent inspection must
be performed by a? Designated person
8. According to OSHA, the maximum twist of the
hook can't exceed? 10 degrees
, NCCCO OVERHEAD CRANE REAL EXAM
QUESTIONS AND ANSWERS VERIFIED GRADED
A+ 2024 UPDATED
9. When inspecting electrical contacts, what are the
signs they are bad? Pitted or burned
10. According to ASME B30.2, what type of fire extinguisher is
required for overhead cranes? 10BC
11. Before leaving an overhead crane unattended,
attached loads should be? Lowered to the floor
12. Before using your hand to steady any
load, you should? Follow company policy
13. According to OSHA, the rated capacity of all
overhead cranes shall be? Clearly marked on the side of
the crane
14. When attaching spreaders to any load, you must
keep in mind that? The lower the spreader angle the
greater the tension
15. By order of hitch strength, which is correct?
a. Vertical, basket, choker
b. Basket, vertical, choker
, NCCCO OVERHEAD CRANE REAL EXAM
QUESTIONS AND ANSWERS VERIFIED GRADED
A+ 2024 UPDATED
c. Basket, choker, vertical
d. Choker, basket,
vertical Basket,
vertical, choker
16. According to OSHA, the maximum hook throat
opening must not exceed? 15% of its original size