Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MIS 3320 Final Exam by Baylor Sullivan Review 2024/2025

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
12-06-2024
Written in
2023/2024

MIS 3320 Final Exam by Baylor Sullivan Review 2024/2025 Select THREE reasons why we need a formal process of analyzing and designing a system. 1. To deliver value as promised 2. To minimize failure 3. To avoid creating an intuition based-system The following option is a stage in the system development life cycle EXCEPT... Coding Identify opportunity, analyze feasibility, and develop work plans are the activities a system analyst does during the __________ stage of the system development life-cycle. Planning Under what stage of the SDLC does a project team father the requirements for the new system? Analysis A system analyst MUST have the following skills EXCEPT... Judgement Skills One possible source of an IS project idea is someone in the organization identifies a business needs to build a system True IS project ideas need to be aligned with business strategies. In other words, business needs to drive IT projects. True At what stage of the SDLC does the project team write the actual programming codes needed for the system? Implementation An IS only consists of software and hardware. False Technical feasibility: Assess the team's familiarity with applications and technology Can we build it? Economic feasibility: Perform a cost/benefit analysis Should we build it? Organizational feasibility: Understand how well the goals of the project align with business objectives If we build it, will it be useful? The following option is considered an aspect of technical feasibility EXCEPT: Cost-benefit analysis EXAMPLES INCLUDE: Project size Familiarity with technology Familiarity with application Compatibility Under what type of feasibility do you conduct a stakeholder analysis? Organization feasibility The following examples are considered tangible benefits EXCEPT: Increased brand recognition EXAMPLES INCLUDE: Reductions in staff Increased

Show more Read less
Institution
Course

Content preview

MIS 3320 Final Exam by Baylor Sullivan
Review 2024/2025
Select THREE reasons why we need a formal process of analyzing and designing a system.
1. To deliver value as promised
2. To minimize failure
3. To avoid creating an intuition based-system


The following option is a stage in the system development life cycle EXCEPT...
Coding


Identify opportunity, analyze feasibility, and develop work plans are the activities a system analyst
does during the __________ stage of the system development life-cycle.
Planning


Under what stage of the SDLC does a project team father the requirements for the new system?
Analysis


A system analyst MUST have the following skills EXCEPT...
Judgement Skills


One possible source of an IS project idea is someone in the organization identifies a business needs to
build a system
True


IS project ideas need to be aligned with business strategies. In other words, business needs to drive IT
projects.
True


At what stage of the SDLC does the project team write the actual programming codes needed for the
system?
Implementation


An IS only consists of software and hardware.
False


Technical feasibility:
Assess the team's familiarity with applications and technology

Can we build it?


Economic feasibility:
Perform a cost/benefit analysis

Should we build it?

, Organizational feasibility:
Understand how well the goals of the project align with business objectives

If we build it, will it be useful?


The following option is considered an aspect of technical feasibility EXCEPT:
Cost-benefit analysis

EXAMPLES INCLUDE:
Project size
Familiarity with technology
Familiarity with application
Compatibility


Under what type of feasibility do you conduct a stakeholder analysis?
Organization feasibility


The following examples are considered tangible benefits EXCEPT:
Increased brand recognition

EXAMPLES INCLUDE:
Reductions in staff
Increased sales
Reductions in IT costs


THREE variants of Rapid Application Development discussed in module 3 include:
Iterative model
Throwaway prototyping
System prototyping


Which of the following options is a characteristic of a waterfall approach?
The project team proceeds sequentially from one phase to the next


Waterfall:
The requirements are defined long before the programming begins. This method also emphasizes on
detailed documents


Rapid Application Development
The team begins developing the most critical requirements in the early version of the system


Agile methodology
Focuses on short cycles that produce a complete software product. An example of this methodology is
Scrum.


You are developing a new system. You'd like to focus on the verification and validation of the system
because your goal is to improve the quality of the system by including Quality Assurance expertise
early in the project strengthens system quality. What method do you use in this case?
V-Model

Written for

Course

Document information

Uploaded on
June 12, 2024
Number of pages
11
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.59
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ACADEMICAIDSTORE Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
1214
Member since
4 year
Number of followers
892
Documents
12023
Last sold
1 day ago
ACADEMICAID STORE

Welcome to ACADEMICAID store! We specialize in reliable test banks, exam questions with verified answers, practice exams, study guides, and complete exam review materials to help students pass on the first try. Our uploads support Nursing programs, professional certifications, business courses, accounting classes, and college-level exams. All documents are well-organized, accurate, exam-focused, and easy to follow, making them ideal for quizzes, midterms, finals, ATI & HESI prep, NCLEX-style practice, certification exams, and last-minute reviews. If you’re looking for trusted test banks, comprehensive exam prep, and time-saving study resources, you’re in the right place.

Read more Read less
4.1

176 reviews

5
98
4
29
3
28
2
6
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions