Answers | Verified | Latest 2024 Version
What is the timetable direction when moving from MP 27.0 to Coal Jct. on the coal subdivision? -
✔✔Westward.
What is the length of the siding at Buddwood on the Woods subdivision? - ✔✔8442 Feet.
H & H Feed is a location not shown as a station on the Woods subdivision, what is the length of the track
at H & H Feed? - ✔✔763 Feet.
What is the milepost location of Cutoff Jct. on the Coal subdivision? - ✔✔21.6
In the station column of the Woods Subdivision Special Instructions, what do letters B, C, and P next to
Buddwood stand for? - ✔✔General Orders, Notices and Circulars, Radio Communication and Telephone.
What is the correct distance between West Crusher Jct. and Hill on the Coal subdivision? - ✔✔2.0 miles.
What timetable direction are you moving from Hendon Grove to Rockton, on the Woods subdivision? -
✔✔Eastward.
What is the maximum speed for freight trains over 100 tons per operative brake on the Woods
subdivision? - ✔✔45 MPH.
What is the maximum speed for freight trains between Lyndon and Cragar, on the Pineland subdivision? -
✔✔49 MPH.
What is the maximum speed for freight trains moving against the current of traffic between Hope and
Topaz on the Pineland subdivision? - ✔✔49 MPH.
What is the maximum speed for freight trains on the coal subdivision if they contain no empty cars, do
not exceed 8500 feet, do not average more than 80 TOB and the engineer can control speed of train
, without the use of air brakes? Where is this info found? - ✔✔70 MPH Item 1(A) Coal Subdivision Special
Instructions.
What is the maximum speed for freight trains between MP 41.3 and MP 41.0 on the Woods subdivision?
- ✔✔45 MPH.
What is the maximum speed for freight trains between MP 481.6 and MP 481.9 on the Reydon
subdivision? - ✔✔55 MPH.
What is the maximum speed for freight trains on the siding at Hill on the Coal subdivision? - ✔✔25 MPH.
What is the maximum speed for freight trains through the turnout at Cutoff Jct. on the Coal subdivision?
- ✔✔40 MPH.
What are the bridge and equipment weight restrictions on the Pineland subdivision? - ✔✔143 tons
between Krylon and Baxter.
What type of main track authority is in effect on the Coal subdivision? - ✔✔Centralized Traffic Control.
How many main tracks does the Coal subdivision have between MP 18 and MP 20? - ✔✔1 main track.
What type of authority is needed, if any, to operate on the siding at Hill on the Coal subdivision? -
✔✔Centralized Traffic Control.
What type of main track authority is in effect on the Woods subdivision? - ✔✔Centralized Traffic Control.
What individual subdivision special instruction item number deals with trackside warning detectors? -
✔✔5.
How many TWDs protect bridge, tunnels, and other structures on the Woods subdivision? - ✔✔None.