Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

CAPM Practice Exam 150 Questions with 100% Correct Answers Latest Version 2024 | Verified

Beoordeling
-
Verkocht
-
Pagina's
15
Cijfer
A+
Geüpload op
16-06-2024
Geschreven in
2023/2024

CAPM Practice Exam 150 Questions with 100% Correct Answers | Latest Version 2024 | Verified 1. The process of establishing clear and achievable objectives, measuring their achievement, and adjusting performance in accordance with the results of the measurement is called: - Management by Objectives 2. During the full life cycle of the project, a plot of the project's expected expenditures will usually follow a characteristic S curve. This indicates that: - The bulk of the project budget will be spent in the execution phase 3. In which project lifecycle phase would you expect to have the greatest influence on overall project cost? - Concept 4. Requirement is - - Quantified and documented needs of stakeholders, customer, and sponsor 5. TQM is - - Total Quality Management: A common approach to implementing a quality improvement program 6. Which describes Management Information Systems? - Software that an enterprise uses to support business and administrative operations 7. The type of planning that is equated with more specific data or is detailed in nature is called: - Tactical 8. What are the different types of costs in Microsoft Project? - Fixed Cost, Cost Per Use, Standard Cost, Overtime Cost 9. What is the name of PMI's Organization maturity model for project management? - OPM311. A group of related projects that are managed in a coordinated way that usually includes an element of ongoing activity is called a: - Program 12. Project constraint could be on - - Cost, resources, schedule 13. What is true about Project Management Office (PMO)? - Support Project Managers by coaching and mentoring PMO is a project stakeholder PMO can terminate projects if required to keep business objectives consistent 14. Projects require project management while operations require business process management or operations management. Projects can intersect with operations at various points during the product lifecycle. Which of the following is not a stage to represent this? - At each Executing phase 15. Enterprise environmental factors refer to both internal and external environmental factor that surround or influence a project's success. Of the following, which is NOT an enterprise environmental factor : - Historical data 16. A person who is involved in or may be affected by the activities or anyone who has something to gain or lose by the activity of the project is called a: - Stakeholder 17. Large projects may be divided into smaller, more manageable components known as, - subprojects 18. A manager who manages a group of related projects is called a - - Program manager 19. Which activity is conducted last as part of closing process group - Customer satisfaction survey 20. In the PMBOK, each process is broken into - - Inputs and Outputs Tools and techniques

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

CAPM Practice Exam 150 Questions with
100% Correct Answers | Latest Version
2024 | Verified
1. The process of establishing clear and achievable objectives, measuring their achievement, and
adjusting performance in accordance with the results of the measurement is called: - ✔✔Management
by Objectives



2. During the full life cycle of the project, a plot of the project's expected expenditures will usually follow
a characteristic S curve. This indicates that: - ✔✔The bulk of the project budget will be spent in the
execution phase



3. In which project lifecycle phase would you expect to have the greatest influence on overall project
cost? - ✔✔Concept



4. Requirement is - - ✔✔Quantified and documented needs of stakeholders, customer, and sponsor



5. TQM is - - ✔✔Total Quality Management: A common approach to implementing a quality
improvement program



6. Which describes Management Information Systems? - ✔✔Software that an enterprise uses to support
business and administrative operations



7. The type of planning that is equated with more specific data or is detailed in nature is called: -
✔✔Tactical



8. What are the different types of costs in Microsoft Project? - ✔✔Fixed Cost, Cost Per Use, Standard
Cost, Overtime Cost



9. What is the name of PMI's Organization maturity model for project management? - ✔✔OPM3

, 11. A group of related projects that are managed in a coordinated way that usually includes an element
of ongoing activity is called a: - ✔✔Program



12. Project constraint could be on - - ✔✔Cost, resources, schedule



13. What is true about Project Management Office (PMO)? - ✔✔Support Project Managers by coaching
and mentoring

PMO is a project stakeholder

PMO can terminate projects if required to keep business objectives consistent



14. Projects require project management while operations require business process management or
operations management. Projects can intersect with operations at various points during the product
lifecycle. Which of the following is not a stage to represent this? - ✔✔At each Executing phase



15. Enterprise environmental factors refer to both internal and external environmental factor that
surround or influence a project's success. Of the following, which is NOT an enterprise environmental
factor : - ✔✔Historical data



16. A person who is involved in or may be affected by the activities or anyone who has something to gain
or lose by the activity of the project is called a: - ✔✔Stakeholder



17. Large projects may be divided into smaller, more manageable components known as, -
✔✔subprojects



18. A manager who manages a group of related projects is called a - - ✔✔Program manager



19. Which activity is conducted last as part of closing process group - ✔✔Customer satisfaction survey



20. In the PMBOK, each process is broken into - - ✔✔Inputs and Outputs

Tools and techniques

Geschreven voor

Vak

Documentinformatie

Geüpload op
16 juni 2024
Aantal pagina's
15
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
hov
1.0
(2)

Maak kennis met de verkoper

Seller avatar
hov State University Of West Georgia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
3
Documenten
2125
Laatst verkocht
2 maanden geleden
Academic Avengers

Expert Verified Exams {Latest Versions} 99% Pass Rate

1.0

2 beoordelingen

5
0
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen