Michigan Builders License Questions And Answers Verified And Updated Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - correct ans
Michigan Builders License Questions And Answers Verified And Updated Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. - correct answer.IRC (International Residential Code) Administrative - correct answer.First 2 chapters of code book are True - correct answer.Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes - correct answer.Does the building official have the authority to render interpretations of the code? 8 foot fence. - correct answer.None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False - correct answer.Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. - correct answer.The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. - correct answer.If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F Figures. - correct answer.Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. - correct answer.Generally speaking, the building official's job is to True. - correct answer.It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. - correct answer.All of the following are not considered habitable spaces EXCEPT: bathrooms kitchens storage spaces closets 3. - correct answer.Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. 44 inches. - correct answer.The maximum height of an egress window above the floor is 5.7 sq ft. - correct answer.A basement bedroom must have an egress window with a clear opening of at least ______ square feet. 3. - correct answer.At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. 30 inches. - correct answer.A porch more than _____ inches above grade must be provided with 36" guards. 200. - correct answer.Wall and ceiling finishes shall have a flame-spread classification of no more than ______ . 7 days. - correct answer.According to code, concrete must reach at least 70% of it's ability within ____________days. 40%. - correct answer.A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. Additions, alterations, renovation and repairs. - correct answer.The Michigan Uniform Energy code applies to new buildings as well as U-factor. - correct answer.___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. 50%. - correct answer.Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. R-3. - correct answer.Michigan requires a minimum thermal resistance of ____________for mechanical system piping. True. - correct answer.Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F Prescriptive Path. - correct answer._______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. Area weighted averages. - correct answer.___________ can be used to satisfy U-factor and SHGC requirements. IC (Insulation Contact) - correct answer.Recessed lights must be _____ rated. True. - correct answer.Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F Registered design professional. - correct answer.The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. - correct answer.One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. - correct answer.Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name - correct answer.Insulation products (blown and sprayed) must be documented with: March 2011. - correct answer.The new Michigan codes took effect in 10. - correct answer.Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. - correct answer.The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems - correct answer.Plans and specifications must be detailed in regards to: 2009. - correct answer.In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. Air leakage. - correct answer.___________ is the rate of air infiltration in the presence of a specific pressure differential. Windows Attic access hatches Recessed lights - correct answer.Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1.1 2009 IECC - correct answer.R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code - correct answer.IECC U-factor and UA alternatives. - correct answer.The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet - correct answer.R-30 is permitted in vaulted ceilings, but is limited to True. - correct answer.Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F 5, 6 and 7. - correct answer.Michigan falls into climate zones False. - correct answer.It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F IC rated (Insulation Contact) - correct answer.__________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. 3%. - correct answer.According to the Dept. of Energy, improved energy codes could reduce CO2 emissions by 300 sq ft. - correct answer.Attic insulation markers must be installed every _____ square feet. True. - correct answer.Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F Yes. - correct answer.A contractor needs to remove a non-load bearing wall, does he need to pull a permit? No. - correct answer.A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? Yes. - correct answer.A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? Health department. - correct answer.Who issues a well and septic permit? 200 sq. feet. IRC R105 - correct answer.Permits are not required for one story detached accessory structures not exceeding: The next business day. - correct answer.If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: True. - correct answer.If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. No. IRC R104.8 - correct answer.Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? Yes. - correct answer.An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit? 6 ft. IRC R105.2 - correct answer.Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. 180 days. - correct answer.If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. Yes. - correct answer.Can a building official revoke a Certificate of Occupancy? True. - correct answer.When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F 450 - correct answer.Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed 8". - correct answer.Foam plastic used for interior trim shall have a maximum thickness of 1/2" and a maximum width of 10%. - correct answer.Foam plastic interior trim must not constitute more than __________ of the total wall and ceiling area of any room or space. 1/2". - correct answer.Foam plastic used as insulation in walls must be separated by an approved thermal barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier for spray foam insulated walls? Framing. - correct answer.Which of these inspections happens last? Mechanical rough Plumbing rough Framing Electrical rough Yes. - correct answer.A retaining wall will be five feet tall from the bottom of the footing to the top of the wall. Do you need to pull a permit? At the time of inspection. - correct answer.Your building is utilizing engineered products such as engineered floor joists. When do the installation instructions need to be available at the work site? 1 3/8" solid wood 1 3/8" honeycomb core 20 minute fire rated Any of the above - correct answer.A door directly between a garage and a residence shall never open directly into a sleeping room. The door must also be 1 1/4" - correct answer.The nosing for stairs shall not be less than 3/4" but not be more than No. - correct answer.A front porch is 25 inches above the grade below. Are guards required to be installed? False. - correct answer.If a smoke alarm is in a bedroom, it doesn't need to be right outside the bedroom also. 1/2" - correct answer.If spray foam insulation is used to insulate a wall, what is the minimum thickness of drywall needed to cover the foam plastic? 200 - correct answer.Finishing materials used for walls and ceiling shall have a flame-spread index not to exceed No. - correct answer.Wood joists are 19" above exposed ground. Do they have to be preservative treated or naturally durable wood? True. - correct answer.You may bulldoze, grade and remove tree stumps in a wetland as long as you have a permit. True. - correct answer.Current code requires that the lowest floors in newly constructed buildings in flood hazard areas not located in designated Coastal A Zones, must have the lowest floors elevated to or above the 100-year design flood elevation. T or F Cohesive, granular, organic. - correct answer.What are the three basic soil types? Reduce settling Provide stability Increase load-bearing capacity - correct answer.The principal reasons to understand soil composition are to: 150 yards - correct answer.If a excavating company needs to haul away 125 yards of bank soil that will swell 20% how many yards of loose soil will they haul away? Setback. - correct answer.The exact location of property lines should be determined early in the design phase in order to comply with __________ requirements. True. - correct answer.A garden shed over 200 square feet will require a T or F Bulldozer. - correct answer.What tool would you use to peel back topsoil? Cutting into Piling soil over Compacting - correct answer._________ the root system of a tree during construction can potentially kill it. Builders level. - correct answer.You would use a ________ to determine a floor is level, but this tool would not help determine if a wall is plumb. 1/2 inch. - correct answer.The condition of erosion control devices must be checked after a rainfall event of _______ or more within a 24 hour period. 15 feet from the property line. - correct answer.A side yard easement of 15 feet means your building structure must be: Who set the monument When was it set Where was it set - correct answer.You can identify survey monuments by the following Easements. - correct answer.Public _________ provide utilities access to run lines or pipes across or under your property. Fill. - correct answer.A deposit of earth material placed by artificial means is called True. - correct answer.Grading is changing the earth surface by either excavating or filling or a combination of both. T or F Rough grade. - correct answer.The stage at which the grade approximately conforms to approved plans is called: True. - correct answer.Water wells should be located on the opposite side or uphill side of the house from the drainfield. T or F Lifts. - correct answer.When back filling around the foundation the soil should be compacted in __________ of 6 inches at a time. True. - correct answer.The ablility to achieve maximum density when compacting soil requires that the soil has it's optimum moistute content. T or F True. - correct answer.The heavier the plates are on a vibratoty plate compactor the more compaction force it will generate. T or F False. - correct answer.All soil types have the same optimum moisture content for compaction. Plot plan and site plan. - correct answer.Which drawing shows the shape and boundary lines of a lot, as well as locating the building, driveway, sidewalks, well and septic system, elevation contours, etc. Plot Plan Site plan Elevation plan Both A and B Proctor test Sand cone test Nuclear density test - correct answer.What is a method of determining soil density? Without adequate moisture or containing too much water. - correct answer.It is virtually impossible to compact soil without adequate moisture containing too much water with optimum moisture content both A and B Point of reference or a benchmark. - correct answer.A basic starting point from which measurements in building layout can be made using a transit or builders level is called a All of the above. - correct answer.When building in a floodplain, special precaution must be made concerning: flood resistant construction. determining the design flood elevation. placing the lowest floor at the proper elevation. all of the above Parking vehicles , building access or storage. - correct answer.When building in a floodplain, enclosed areas below the design flood elevation will be used solely for True. - correct answer.Increasing the weight of the plates on vibratory plate compactors is the best way to increase their efficiency. T or F True. - correct answer.Rammers are the most efficient compactor to use in clay (cohesive) soils. T or F A
Geschreven voor
- Instelling
- Michigan builders
- Vak
- Michigan builders
Documentinformatie
- Geüpload op
- 17 juni 2024
- Aantal pagina's
- 54
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
michigan builders