When a new system has been assembled, the first thing to do is? Pressurize the system with an inert gas & leak check. After installation of a field-piped R-410A split heat pulp, the unit should first be? Pressurized with nitrogen then leak checked. The EPA regulations require that any appliances containing more than 50 pounds of refrigerant (except for commercial & industrial process refrigeration) must be repaired when the leak rate exceeds _________ of the charge per year? 15% R-410A requires recovery tanks rated for at least? 400 psig After refrigerant liquid has been recovered from a system, any remaining vapor is? Condensed by the recovery system. Your recovery/recycling machine has R-502 refrigerant in it. You now have to recover refrigerant from a unit with R-22. What must be done before the R-22 refrigerant can be recovered/recycled? Recover as much R-502 from the recovery unit as possible, change filter, & evacuate. In a refrigeration system with a TXV (or other type of throttling device), the component directly following the condenser is the? Receiver When charging an R-410A system that uses a water-cooled condenser, you must first charge with vapor to a pressure of at least________, before switching to liquid charging. 120 psig Recovered refrigerant may contain what? 1.) Acids 2.) Moisture 3.) Oils Your recovery/recycling machine has R-22 refrigerant in it. You now have to recover refrigerant from a unit with R-410A. What must be done before your recovery unit can be used to recover R-410A? 1.) The recovery unit must be EPA certified for use with R-410A. 2.) The recovery tank must be designed for the pressure of R-410A. 3.) The filter & lubricant in the recovery unit must be changed, & the recovery unit evacuated. To recover liquid refrigerant, you must connect one hose to the? Liquid Line. The proper charging method for blended (non-azeotropic) refrigerants (400

Show more Read less
Institution
Course

Content preview

EPA 608 (TYPE II) Exam
When a new system has been assembled, the first thing to do is?
Pressurize the system with an inert gas & leak check.
After installation of a field-piped R-410A split heat pulp, the unit should first be?
Pressurized with nitrogen then leak checked.
The EPA regulations require that any appliances containing more than 50 pounds of
refrigerant (except for commercial & industrial process refrigeration) must be repaired
when the leak rate exceeds _________ of the charge per year?
15%
R-410A requires recovery tanks rated for at least?
400 psig
After refrigerant liquid has been recovered from a system, any remaining vapor is?
Condensed by the recovery system.
Your recovery/recycling machine has R-502 refrigerant in it. You now have to recover
refrigerant from a unit with R-22. What must be done before the R-22 refrigerant can be
recovered/recycled?
Recover as much R-502 from the recovery unit as possible, change filter, & evacuate.
In a refrigeration system with a TXV (or other type of throttling device), the component
directly following the condenser is the?
Receiver
When charging an R-410A system that uses a water-cooled condenser, you must first
charge with vapor to a pressure of at least________, before switching to liquid charging.
120 psig
Recovered refrigerant may contain what?
1.) Acids

2.) Moisture

3.) Oils
Your recovery/recycling machine has R-22 refrigerant in it. You now have to recover
refrigerant from a unit with R-410A. What must be done before your recovery unit can
be used to recover R-410A?
1.) The recovery unit must be EPA certified for use with R-410A.

2.) The recovery tank must be designed for the pressure of R-410A.

3.) The filter & lubricant in the recovery unit must be changed, & the recovery unit
evacuated.
To recover liquid refrigerant, you must connect one hose to the?
Liquid Line.
The proper charging method for blended (non-azeotropic) refrigerants (400 Series) is to
use a remove the charge from the cylinder as a?
Liquid
00:0201:17

, Before using a recovery unit to remove a charge, what steps should be taken?
1.) Check service valve positions.

2.) Check the oil level in the recovery unit.

3.) Evacuate recovery unit & recovery tank.
On refrigeration units that use an open compressor; the ________ is most likely to leak
if the unit is not used for several months.
The rotating shaft seal.
Noncondensables in a system cause?
Higher discharge pressure.
Heat Pumps that use R-410A should be leak checked with?
Pressurized Nitrogen.
A reciprocating compressor should not be energized when?
The discharge service valve is closed.
In a refrigeration system, the component directly following the evaporator is the?
Accumulator.
Manifold gauge set hoses should have self-sealing connectors or hand valves to?
Minimize the release of refrigerant when the hoses are connected & disconnected.
The EPA regulations require that leaking commercial or industrial process refrigeration
equipment must be repaired when the leak rate exceeds _____ of the charge per year.
35%
Moisture is removed from a system by?
Using a filter drier.
Oil foaming usually occurs in the?
Compressor
R-410A is different from other ASHRAE 400 series non-azeotropic blends because?
R-410A behaves as a near azeotropic refrigerant, & can be topped off.
With an air-cooled condenser on the roof of a building & the evaporator on the first floor,
recovery should first occur?
From the liquid line entering the evaporator.
A deep vacuum is usually measured in?
Microns.
Heat Pumps that use R-134A should be leak checked with?
Pressurized Nitrogen.
During the evacuation of a system that contains large amounts of moisture it may be
necessary to increase pressure in the system with ________, to counteract the freezing
of the moisture.
Nitrogen.
When under a deep vacuum, the motor winding of a hermetic refrigeration compressor?
Will be damaged if energized.
When using recovery or recycling equipment that was manufactured AFTER November
15, 1993: you must evacuate a system containing MORE than 200 pounds of CFC-12 to
_______ before making a major repair.
15 inches Hg vacuum
When inspecting a system for leaks, you should look for?

Written for

Course

Document information

Uploaded on
June 17, 2024
Number of pages
5
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$10.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
allanokello366

Get to know the seller

Seller avatar
allanokello366 Hohokus Rets
Follow You need to be logged in order to follow users or courses
Sold
-
Member since
1 year
Number of followers
0
Documents
17
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions