Updated
Which of the following are a benefit to building Express Lanes?
a. Provide drivers with travel choices
b. Offer a more predictable travel time
c. Deliver a long-term solution to congestion management
d. All of the above **** d. All of the above
Where are the starting and ending points of the 589 express lanes segment 1?
a. Wilsky to Gunn Hwy
b. Memorial Hwy to Gunn Hwy
c. Dale Mabry to Van Dyke Rd
d. Hillsborough Ave to Memorial Hwy **** b. Memorial Hwy to Gunn Hwy
Where are the starting and ending points of the 589 express lanes segment 2?
a. Hillsborough Ave to Gunn Hwy
b. Dale Mabry Hwy to Memorial Ave
c. Memorial Ave to Wilsky Blvd
d. Gunn Hwy to Dale Mabry Hwy **** d. Gunn Hwy to Dale Mabry Hwy
Which of these vehicles are permitted to use the Express Lanes?
a. A two-axle vehicle with a SunPass
b. A truck with three or more axles
c. A vehicle towing a boat
d. All of the above **** a. A two-axle vehicle with a SunPass
Drivers may be billed via "Toll by Plate" on the Veterans' Express Lanes
True or False **** False
Express Lane marker are placed how many feet apart?
a. 2 feet
b. 5 feet
c. 10 feet
d. 15 feet **** b. 5 feet
,Express Lane markers are made to be easily removable
True or False **** False
How many consecutive express lane markers must be missing to be considered an
emergency?
a. 1
b. 2
c. 3
d. 4 **** c. 3
What hours do the SR 589 IRT and Flatbed trucks operate?
a. 6am-10am, 4pm-8pm (M-F)
b. 5am-9pm (M-F)
c. 5am-9am, 3pm-7pm (M-F)
d. 24/7 **** b. 5am-9pm (M-F)
An LSDMS (Lane Status DMS) is used to notify the user whether the facility is open or
closed.
True or False **** True
Which of the following is designated as an "Emergency Relocation Site" for the
Veteran's Express lanes?
a. Exit 3- Memorial Hwy - left shoulder of NB on ramp
b. MP 8.5 NB and SB- paved shoulder behind barrier wall
c. Exit 8- Wilsky Blvd paved cul-de-sac
d. All of the above **** d. All of the above
What pre-defined response plan would you utilize for an Express Lanes closure at MP 8
NB?
a. Express Lanes SR 589 Phase 1 NB Closure
b. Express Lanes SR 589 Phase 1 SB Closure
c. Express Lanes SR 589 Phase 2 NB Closure
d. Express Lanes SR 589 Phase 2 SB Closure **** a. Express Lanes SR 589 Phase 1
NB Closure
What pre-defined response plan would you utilize for an Express Lanes closure at MP 8
SB?
a. Express Lanes SR 589 Phase 1 NB Closure
b. Express Lanes SR 589 Phase 1 SB Closure
c. Express Lanes SR 589 Phase 2 NB Closure
, d. Express Lanes SR 589 Phase 2 SB Closure **** b. Express Lanes SR 589 Phase 1
SB Closure
If an Express Lane device fails, who is the appropriate contact (in the absence of the
Help Desk Specialist)?
a. DBI
b. Jorgensen
c. Roadway Maintenance
d. Ryan Brown **** a. DBI
Asset Maintenance requires what response time to the Express Lanes during after-
hours/weekends?
a. 30 minutes
b. 45 minutes
c. 60 minutes
d. 2 hours **** a. 30 minutes
If an event is blocking the buffer area between the general toll lanes and the express
lanes, what should the toll rate in the Express Lanes be set to?
a. Maximum toll
b. General toll only
c. $0
d. Held to current amount **** d. Held to current amount
Road Rangers are allowed to cross the solid double white line and plastic express lanes
marker when responding to and departing an event.
True or False **** True
Which of the following is the location where the flatbed Road Ranger truck stages
during AM peak?
a. MP 3, Memorial Hwy
b. MP 8, Wilsky Blvd
c. MP 14, Van Dyke Road
d. None of the above **** b. MP 8, Wilsky Blvd
Which of the following is the location where the flatbed Road Ranger truck stages
during PM peak?
a. MP 3, Memorial Hwy
b. Exit 9, Gunn Hwy
c. MP 14, Van Dyke Road
d. None of the above **** b. Exit 9, Gunn Hwy