LEED Green Associate Exam Questions With Answers [EQ] Construction Indoor Air Quality Management Plan Credit Intent: to promote the well-being of construction workers and building occupants by minimizing indoor air quality problems associated with construction and renovation Credit Requirements: - Develop an indoor air quality (IAQ) plan for construction and preoccupancy phases of the building - Meet or exceed Control Measures from SMACNA IAQ Guidelines for Occupied Buildings Under Construction, 2nd edition, 2007 - Protect absorptive materials from moisture damage - Install MERV 8 or class F5 at return air grille and return or transfer duct inlet opening for any equipment that will be operated during construction. Install final design filtration media immediately prior to occupancy - Prohibit use of tobacco inside the building and within 25 of the building entrance during construction Ref: SMACNA (Sheet Metal and Air-Conditioning National Contractors Associations) IAQ Guidelines for Occupied Buildings Under Construction, 2nd edition, 2007 - ASHRAE 52.2-2007 - CEN Standard EN 779-2002 [EQ] Minimum Indoor Air Quality Prereq and Enhanced Indoor Air Quality Credit Intent: to contribute to the comfort and well-being of building occupants by establishing minimum standards for indoor air quality (IAQ) Prereq Requirements: Mechanically Ventilated Spaces (Ventilation) Option 1. ASHRAE Standard 62.1-2010 Use ASHRAE Standard 62.1-2010 to establish minimum outdoor air intake flow using the Ventilation Rate Procedure and follow Sections 4-7 (or local code if more stringent) Option 2. CEN Standards EN and EN *Non-US projects only Mechanically Ventilated Spaces (Monitoring) Variable Air Volume (VAV) Systems - Provide direct outdoor air intake monitoring with an alarm if airflow varies by more than 15% from setpoint Constant-Volume Systems - Balance outdoor airflow to at least the design minimum of ASHRAE Standard 62.1-2010 and install a current transducer Naturally Ventilated Spaces (Ventilation) - Determine minimum air opening space configuration requirements using natural ventilation procedure using ASHRAE Standard 62.1-2010 (or local code if more stringent) - Follow ASHRAE Standard 62.1-2010 Section 4 (or local code if more stringent) - Confirm natural ventilation will be effective using CIBSE AM10 Naturally Ventilated Spaces (Monitoring) - Measure the exhaust airflow and have an alarm if it varies by more than 15% from setpoint - Automatic indication devices for windows and other operable devices used to meet minimum requirements with an alarm if any opening is closed during occupied hours - CO2 monitoring in each thermal zone from 3-6 ft above the floor. CO2 monitors to have visual or audio indicator (or alert to the building automation system) if CO2 levels vary by 10% from setpoint (calculated using ASHRAE Standard 62.1-2010) ** Residential Requirements (Additional) - No unvented combustion appliances (e.g. decorative logs) - Carbon Monoxide (CO) monit USGBC Mission To transform the way buildings and communities are designed, built and operated, enabling an environmentally and socially responsible, healthy, and prosperous environment that improves the quality of life. What does LEED stand for? Leadership in Energy and Environmental Design

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

LEED Green Associate Exam Questions With
Answers
[EQ] Construction Indoor Air Quality Management Plan Credit

Intent: to promote the well-being of construction workers and building occupants by minimizing
indoor air quality problems associated with construction and renovation

Credit Requirements:

- Develop an indoor air quality (IAQ) plan for construction and preoccupancy phases of the building

- Meet or exceed Control Measures from SMACNA IAQ Guidelines for Occupied Buildings Under
Construction, 2nd edition, 2007

- Protect absorptive materials from moisture damage

- Install MERV 8 or class F5 at return air grille and return or transfer duct inlet opening for any
equipment that will be operated during construction. Install final design filtration media immediately
prior to occupancy

- Prohibit use of tobacco inside the building and within 25 of the building entrance during
construction

Ref: SMACNA (Sheet Metal and Air-Conditioning National Contractors Associations) IAQ Guidelines for
Occupied Buildings Under Construction, 2nd edition, 2007

- ASHRAE 52.2-2007

- CEN Standard EN 779-2002



[EQ] Minimum Indoor Air Quality Prereq and Enhanced Indoor Air Quality Credit

Intent: to contribute to the comfort and well-being of building occupants by establishing minimum
standards for indoor air quality (IAQ)

Prereq Requirements:
Mechanically Ventilated Spaces (Ventilation)
Option 1. ASHRAE Standard 62.1-2010
Use ASHRAE Standard 62.1-2010 to establish minimum outdoor air intake flow using the Ventilation
Rate Procedure and follow Sections 4-7 (or local code if more stringent)

Option 2. CEN Standards EN 15251-2007 and EN 13779-2007
*Non-US projects only

Mechanically Ventilated Spaces (Monitoring)
Variable Air Volume (VAV) Systems
- Provide direct outdoor air intake monitoring with an alarm if airflow varies by more than 15% from
setpoint

Constant-Volume Systems
- Balance outdoor airflow to at least the design minimum of ASHRAE Standard 62.1-2010 and install a
current transducer

Naturally Ventilated Spaces (Ventilation)

,- Determine minimum air opening space configuration requirements using natural ventilation
procedure using ASHRAE Standard 62.1-2010 (or local code if more stringent)
- Follow ASHRAE Standard 62.1-2010 Section 4 (or local code if more stringent)
- Confirm natural ventilation will be effective using CIBSE AM10

Naturally Ventilated Spaces (Monitoring)
- Measure the exhaust airflow and have an alarm if it varies by more than 15% from setpoint
- Automatic indication devices for windows and other operable devices used to meet minimum
requirements with an alarm if any opening is closed during occupied hours
- CO2 monitoring in each thermal zone from 3-6 ft above the floor. CO2 monitors to have visual or
audio indicator (or alert to the building automation system) if CO2 levels vary by 10% from setpoint
(calculated using ASHRAE Standard 62.1-2010)

** Residential Requirements (Additional)
- No unvented combustion appliances (e.g. decorative logs)
- Carbon Monoxide (CO) monit


USGBC Mission
To transform the way buildings and communities are designed, built and operated, enabling an
environmentally and socially responsible, healthy, and prosperous environment that improves the
quality of life.


What does LEED stand for?
Leadership in Energy and Environmental Design


ASHRAE 90.1-2010
Used for [EA] baseline building energy performance


Green-E Energy Product Certification
Used for [EA] green energy and carbon offset certification


CA Dept. Public Health Standard Method v1.1 - 2010
Used for [IEQ] to determine low-emitting products


Triple Bottom Line
People, Planet, Profit; measures an organization's social, environmental, and financial performance


Why build green? (People: Health & Wellbeing)
- Quality of Life
- Access to Nature
- Community


Why build green? (Planet: Resource Management & Climate Change)
- Fossil Fuels (Petroleum, Gas, Coal)
- Water Scarcity
- Building Materials Management
- Soil Erosion

,Why build green? (Profit: Financial Benefits)
- Improved Marketability
- Increased Occupancy & Rental Rates
- Reduced Operating Costs (Energy & Water Savings)


7 LEED Impact Categories / System Goals
- Climate Change
- Human Health
- Water Resources
- Biodiversity
- Green Economy
- Community
- Natural Resources


What does GBCI (Green Building Certification Institute) do?
Administers LEED Accredited Professionals & LEED Building Certification


What does USGBC (United States Green Building Council) do?
Develops & Maintains LEED Rating System


LEED Rating Levels
Certification - 40 points (40%)
Silver Certification - 50 points (50%)
Gold Certification - 60 points (60%)
Platinum Certification - 80 points (80%)


3 Minimum Project Requirements (MPRs)
The requirements that a building must meet before it can consider LEED certification.

1. Must be in a permanent location on existing land
2. Must use reasonable LEED boundaries
3. Must comply with project size requirements
- BD+C and O+M must be at least 1000 sq ft
- Interior must be at least 250 sq ft
- Neighborhood must have at least 2 habitable buildings and be a max of 1500 acres
- Homes must meet the definition for a dwelling unit (permanent provisions for living, sleeping,
eating, cooking and sanitation)


Full-time equivalent (FTE)
The designation for a building occupant who spends 40 hours per week in the project building.
Transient occupants (students, visitors, shoppers, customers) have FTE values based on their hours
per week divided by 40.


What credits are FTE used for?
- Bicycle Storage & Shower
- Green Vehicles
- Parking Capacity
- Water Fixtures

, What does BD+C stand for?
Building Design & Construction


BD+C Adaptations (8)
- New Construction & Major Renovation
- Core & Shell Development
- Schools
- Retail
- Data Centers
- Warehouses & Distribution Centers
- Hospitality
- Healthcare


BD+C Project Scope
- Whole Building Design & Construction
- Buildings (all except homes)
- Major Renovations (HVAC, envelope modifications, major interior rehabilitation


Core & Shell certification is for buildings that _______________ ?
don't include a complete interior fit-out


What does ID+C stand for?
Interior Design & Construction


ID+C Adaptatons (3)
- Commercial Interiors
- Retail
- Hospitality


ID+C Project Scope
Interior Spaces that are a complete interior fit-out


What does O+M stand for?
Operations & Maintenance


O+M Adaptations (6)
- Existing Buildings
- Retail
- Schools
- Hospitality
- Data Centers
- Warehouses & Distribution Centers


O+M Project Scope
- Existing Buildings
- Little to no construction

Geschreven voor

Vak

Documentinformatie

Geüpload op
24 juni 2024
Aantal pagina's
58
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.59
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
LectDan Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
221
Lid sinds
3 jaar
Aantal volgers
157
Documenten
7993
Laatst verkocht
1 week geleden

4.0

48 beoordelingen

5
25
4
12
3
2
2
4
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen