CQM Student Study Guide (Module 2)
1. Name three instances of contractor extension of designs. - correct answer-Fire alarm,
pre-engineer building, structural, concrete reinforce details.
2. Name some possible areas that must be addressed during the contractor's coordination
review of plans and specifications. - correct answer-Site conditions and restraints, Conflicts
and discrepancies between plans and specifications.
3. What are the responsibilities of the QC manager during the design phase of a design build
project? - correct answer-Ensure the design meets the plans and specs, RFI are submitted
correctly.
1. Name three instances of contractor extension of designs. - correct answer-Fire alarm,
pre-engineer building, structural, concrete reinforce details.
2. Name some possible areas that must be addressed during the contractor's coordination
review of plans and specifications. - correct answer-Site conditions and restraints, Conflicts
and discrepancies between plans and specifications.
3. What are the responsibilities of the QC manager during the design phase of a design build
project? - correct answer-Ensure the design meets the plans and specs, RFI are submitted
correctly.