Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

SAFe PRACTITIONER EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED GRADED A LATEST UPDATE

Beoordeling
-
Verkocht
-
Pagina's
21
Cijfer
A+
Geüpload op
26-06-2024
Geschreven in
2023/2024

SAFe PRACTITIONER EXAM QUESTIONS WITH COMPLETE SOLUTIONS VERIFIED GRADED A LATEST UPDATE Product Management is responsible for "what gets built" as defined by the Vision, Roadmap, and what else? A) Program Backlog B) Customers C) Key Stakeholders D) PI Planning Program Backlog Which activity happens in the Inspect and Adapt Workshop? A) A retrospective of the iteration B) Planning the next PI C) A demo of the integrated system D) Refreshing the Program Backlog A demo of the integrated system When is the system demo conducted during program execution? A) At the end of every iteration B) On demand C) Midway through the Program Increment D) When Features are done At the end of every iteration Which statement is true about iteration planning? A) It is required for every iteration to enable fast learning cycles B) It is only required for every third iteration C) It is required for component teams but may not be required for feature teams that have no dependencies on other teams D) It is not required for teams that consistently meet their PI Objectives It is required for every iteration to enable fast learning cycles A user story includes which three things? (Choose three) A) How B) Why C) What D) Where E) Who F) When Who, What, and Why A decrease in variability leads to an increase in what? A) Predictability B) Risk C) Cost D) Length Predictability What is the one key benefit of a Backlog Refinement session? A) It allows the team to state the problem and then think about, what where when and impact B) It serves a variety of purposes, including a dedicated time for planning, retrospective, exploring and innovating C) It is the main way in SAFe for achieving relentless improvement D) It provides time to identify dependencies and issues that could impact the next iteration It provides time to identify dependencies and issues that could impact the next iteration What are two behaviors of an effective Scrum Master? (Choose two) A) To focus on their own objectives and limit interaction with Product Owner B) To work with stakeholders and subject matter experts to define the Epic and its potential benefits C) To act as a servant leader and exhibit Lean-Agile leadership D) To ensure no changes are made to the scope during an iteration E) To facilitate the teams progress toward the iteration goals

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

SAFe PRACTITIONER EXAM QUESTIONS WITH COMPLETE
SOLUTIONS VERIFIED GRADED A LATEST UPDATE

Product Management is responsible for "what gets built" as defined by the
Vision, Roadmap, and what else?
A) Program Backlog
B) Customers
C) Key Stakeholders
D) PI Planning
Program Backlog
Which activity happens in the Inspect and Adapt Workshop?
A) A retrospective of the iteration
B) Planning the next PI
C) A demo of the integrated system
D) Refreshing the Program Backlog
A demo of the integrated system
When is the system demo conducted during program execution?
A) At the end of every iteration
B) On demand
C) Midway through the Program Increment
D) When Features are done
At the end of every iteration
Which statement is true about iteration planning?
A) It is required for every iteration to enable fast learning cycles
B) It is only required for every third iteration
C) It is required for component teams but may not be required for feature teams
that have no dependencies on other teams
D) It is not required for teams that consistently meet their PI Objectives
It is required for every iteration to enable fast learning cycles

,A user story includes which three things? (Choose three)
A) How
B) Why
C) What
D) Where
E) Who
F) When
Who, What, and Why
A decrease in variability leads to an increase in what?
A) Predictability
B) Risk
C) Cost
D) Length
Predictability
What is the one key benefit of a Backlog Refinement session?
A) It allows the team to state the problem and then think about, what where when
and impact
B) It serves a variety of purposes, including a dedicated time for planning,
retrospective, exploring and innovating
C) It is the main way in SAFe for achieving relentless improvement
D) It provides time to identify dependencies and issues that could impact the next
iteration
It provides time to identify dependencies and issues that could impact the next iteration
What are two behaviors of an effective Scrum Master? (Choose two)
A) To focus on their own objectives and limit interaction with Product Owner
B) To work with stakeholders and subject matter experts to define the Epic and
its potential benefits
C) To act as a servant leader and exhibit Lean-Agile leadership
D) To ensure no changes are made to the scope during an iteration
E) To facilitate the teams progress toward the iteration goals

, To act as a servant leader and exhibit Lean-Agile leadership and to facilitate the teams
progress towards the iteration
What statement is true about features and stories?
A) Features should be small enough to fit into an iteration
B) Each feature should have at least five stories
C) Features can be larger than an iteration but Stories should be small enough to
fit into an iteration
D) Stories can be broken into features
Each feature should have at least five stories
Which statement defines the purpose of Iteration Planning (IP)?
A) It is to break stories into tasks that are achievable in the team's capacity
B) It is to explore and implement program Epics and split them into Features to
be further explored
C) It is to organize the work and define a realistic scope for the iteration
D) It is to analyze, approve, and ready Features for implementation
It is to organize the work and define a realistic scope for the iteration
What is the major benefit for reducing batch size?
A) Increase throughput
B) Decrease stress on the system
C) Increase visibility
D) Increase Work-In-Progress
Increase throughput
Develops and delivers solutions incrementally, using a series of fixed-length
iterations within a Program Increment (PI) timebox and aligns teams to a common
business and technology mission.
Agile Release Train
During the Inspect and Adapt event, how are reflection, data collection, problem
solving, and identification of improvement actions used?
A) To help the team bond and work more efficiently together
B) To enhance and improve the innovation and planning processes

Geschreven voor

Vak

Documentinformatie

Geüpload op
26 juni 2024
Aantal pagina's
21
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NurseAdvocate chamberlain College of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
492
Lid sinds
2 jaar
Aantal volgers
77
Documenten
12046
Laatst verkocht
1 dag geleden
NURSE ADVOCATE

I have solutions for following subjects: Nursing, Business, Accounting, statistics, chemistry, Biology and all other subjects. Nursing Being my main profession line, I have essential guides that are Almost A+ graded, I am a very friendly person: If you would not agreed with my solutions I am ready for refund

4.6

237 beoordelingen

5
192
4
14
3
15
2
5
1
11

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen