| Verified | Latest 2024 Version
The method of computation of Contractor's overhead and profits for Change Order prices, where both
additions and deletions are involved, is found in the: - ✔✔conditions of the contract
General Requirements are part of: - ✔✔Specifications
The three essential considerations in the evaluation of a product are - ✔✔Requirements, Criteria, and
Tests
Whose responsibility is it to furnish the Shop Drawings - ✔✔The Contractor
The division of the Work among multiple prime Contracts is described in:
a) Instructions to Bidders.
b) Supplementary Conditions.
c) Division 01.
d) Special Conditions. - ✔✔c) Division 01.
During the Project Conception Stage, the A/E may be retained to:
a) Develop outline specifications
b) Describe the character of the mechanical system
c) Prepare renderings
d) Assist in financial feasibility studies - ✔✔d) Assist in financial feasibility studies
The person who becomes secondarily liable for another's debt or performance is called the:
a) Guarantee
b) Warrantor
c) Guarantor
, d) Warrantee - ✔✔c) Guarantor
What is the main purpose of MasterFormat?
a) for scheduling, value management, recording of design data and managing costs.
b) used during the planning stage of a project.
c) to organize the Project Manual, reference keynotes and detailed cost estimates.
d) when there is a standardized need for information to appear upon each page of a project manual. -
✔✔c) to organize the Project Manual, reference keynotes and detailed cost estimates.
Integrated projects are distinguished by all of the following characteristics except:
a) Development of virtual project model through input from a collaborative team
b) Trust-based collaboration between project team members
c) Maximized efficiency through design, fabrication, and construction
d) "Just as needed" team involvement to reduce owner's pre-construction expenses - ✔✔d) "Just as
needed" team involvement to reduce owner's pre-construction expenses
Outline Specifications are written for
a) only Divisions 02-14 where actual products are discussed
b) Divisions 01-49
c) only Divisions 01-14 (excluding mechanical and electrical)
d) the exclusive use of the A/E - ✔✔b) Divisions 01-49
An example of a MasterFormat Level 3 specification Section is:
a) 05 00 00 Metals.
b) 05 20 00 Metal Joists.
c) 05 21 00 Steel Joist Framing.
d) 05 21 19 Open Web Steel Joist Framing - ✔✔d) 05 21 19 Open Web Steel Joist Framing
What activities take place in the Project Conception Stage?