Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

NCCCO Tower Crane Tests | 100% Correct Answers Verified Latest 2024 Version

Beoordeling
-
Verkocht
-
Pagina's
13
Cijfer
A+
Geüpload op
03-07-2024
Geschreven in
2023/2024

NCCCO Tower Crane Tests | 100% Correct Answers | Verified | Latest 2024 Version Splices in rail tracks shall have - Smooth Joints Hydraulic systems should have their proper fluid level checked - Daily If power fails during operations, the following shouldn't apply - Do your best to finish moving load where it was designated to go If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which the load is to be lifted - Person responsible for lift Where should climbing instructions be kept - ON Site All climbing operations shall be performed under the supervision of - Qualified person When cranes are erected, load limiting devices shall be tested for proper setting and operation - Before crane is placed in service Hooks shall be equipped with latches unless the application makes the use of the latch - Impractical Size and position of signs or panels must satisfy the limitations of - Manufacturer Fall prevention measures are needed for working at locations where you are exposed - To a fall of 6ft or more Travel distance on hand levers shall not be greater - than 14 inches from neutral position For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load is - 15ftAll controls shall be tested by the operator at the - start of new shift Before each climbing operation all load members of the support system shall be - Inspected Chain slings are required to be - ID tagged Welding on loads suspended by the crane can only be done if the load has - Insulated slings How much does an average cubic yard of concrete weight - 4,000 lbs Main power switch for tower crane is - At base of crane Items not listed in the frequent inspection checklist are - Hydraulic pumps and valves for excessive wear or damage When is it necessary to determine that there is no practical alternative way to perform the needed work or to gain access to the area - Personnel Lift Each series of voice signals shall contain three elements stated in the following order - Function and Direction - Distance and speed - Function stop When lifting personnel communication shall be maintained between three of the next four - Person(s) being lifted - Operator - Signal person The condition when the tower load block or hook assembly comes in contact with the upper - Twoblocking Load bearing members of the climbing and support system shall be inspected before each - Climbing operation Where shall a wind velocity indicating device be mounted - At or near the top of crane

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

NCCCO Tower Crane Tests | 100% Correct
Answers | Verified | Latest 2024 Version
Splices in rail tracks shall have - ✔✔Smooth Joints



Hydraulic systems should have their proper fluid level checked - ✔✔Daily


If power fails during operations, the following shouldn't apply - ✔✔Do your best to finish moving load
where it was designated to go


If load is undetermined who is to find out if load weight does not exceed crane rating at radius at which
the load is to be lifted - ✔✔Person responsible for lift



Where should climbing instructions be kept - ✔✔ON Site



All climbing operations shall be performed under the supervision of - ✔✔Qualified person


When cranes are erected, load limiting devices shall be tested for proper setting and operation -
✔✔Before crane is placed in service



Hooks shall be equipped with latches unless the application makes the use of the latch - ✔✔Impractical



Size and position of signs or panels must satisfy the limitations of - ✔✔Manufacturer



Fall prevention measures are needed for working at locations where you are exposed - ✔✔To a fall of 6ft
or more



Travel distance on hand levers shall not be greater - ✔✔than 14 inches from neutral position


For power lines rated 175KV the minimum clearance between the lines and any part of the crane or load
is - ✔✔15ft

, All controls shall be tested by the operator at the - ✔✔start of new shift



Before each climbing operation all load members of the support system shall be - ✔✔Inspected



Chain slings are required to be - ✔✔ID tagged



Welding on loads suspended by the crane can only be done if the load has - ✔✔Insulated slings



How much does an average cubic yard of concrete weight - ✔✔4,000 lbs



Main power switch for tower crane is - ✔✔At base of crane



Items not listed in the frequent inspection checklist are - ✔✔Hydraulic pumps and valves for excessive
wear or damage


When is it necessary to determine that there is no practical alternative way to perform the needed work
or to gain access to the area - ✔✔Personnel Lift


Each series of voice signals shall contain three elements stated in the following order - ✔✔Function and
Direction - Distance and speed - Function stop


When lifting personnel communication shall be maintained between three of the next four -
✔✔Person(s) being lifted - Operator - Signal person



The condition when the tower load block or hook assembly comes in contact with the upper - ✔✔Two-
blocking



Load bearing members of the climbing and support system shall be inspected before each - ✔✔Climbing
operation



Where shall a wind velocity indicating device be mounted - ✔✔At or near the top of crane

Geschreven voor

Vak

Documentinformatie

Geüpload op
3 juli 2024
Aantal pagina's
13
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
hov
1.0
(2)

Maak kennis met de verkoper

Seller avatar
hov State University Of West Georgia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
3
Documenten
2125
Laatst verkocht
2 maanden geleden
Academic Avengers

Expert Verified Exams {Latest Versions} 99% Pass Rate

1.0

2 beoordelingen

5
0
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen