NCCCO MOBILE CRANE TESTS 2024 | 100% Correct Answers | Verified | Latest 2024 Version 1. What action does a signal person intend the operator to perform if he extends his arm at shoulder height, makes a fist with his hand, and sticks his/her thumb up? a. Boom down b. Swing c. Boom up d. Extend boom - c. 2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order for the gross ratings in the load chart to remain valid? a. 1% b. 2% c. 5% d. 8% - a. 3. The load line of the crane you're operating contacts an energized power line. There's no sign of any other danger, such as fire. What should you do? a. Climb down carefully from the crane cab b. Jump down, feet together c. Stay in the cab until the lines are de-energized d. Get as far away from the crane as possible - c. 4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope are cause for replacement of the rope? a. 1 broken wire in 6 rope diameters b. 2 broken wires in 30 rope diameters c. 3 broken wires in one strand in one layd. 2 broken wires in 6 rope diameters - d. 5. What is the net capacity of a crane on main boom unless the manufacturer states otherwise? a. The capacity listed in the load chart minus the weight of the rigging and all attachments b. The capacity listed in the load chart plus the weight of the rigging and all attachments c. The capacity listed in the load chart minus the weight of the rigging and all attachments not in use d. The capacity listed in the load chart minus the weight of the rigging alone - a. 6. What may happen to a properly rigged load when lifted off the ground unless the operator takes account of boom deflection? a. It could swing out away from the crane b. It could swing in towards the crane c. It could raise absolutely vertically d. It could shift in its rigging - a. 7. What Standard Method hand signal is being illustrated? a. Swing b. Stop c. Emergency Stop d. Travel - a. 8. Who should an operator respond to a "stop" signal from? a. Appointed signal person only b. Project manager only c. Superintendent only d. Anyone - d. 9. Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the manufacture

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

NCCCO MOBILE CRANE TESTS 2024 |
100% Correct Answers | Verified | Latest
2024 Version
1. What action does a signal person intend the operator to perform if he extends his arm at shoulder
height, makes a fist with his hand, and sticks his/her thumb up?
a. Boom down
b. Swing
c. Boom up

d. Extend boom - ✔✔c.


2. When hoisting personnel, within what percentage of level must a telescopic boom crane be in order
for the gross ratings in the load chart to remain valid?
a. 1%
b. 2%
c. 5%

d. 8% - ✔✔a.


3. The load line of the crane you're operating contacts an energized power line. There's no sign of any
other danger, such as fire. What should you do?
a. Climb down carefully from the crane cab
b. Jump down, feet together
c. Stay in the cab until the lines are de-energized

d. Get as far away from the crane as possible - ✔✔c.


4. According to OSHA 1926.1413, how many randomly distributed broken wires in rotation-resistant rope
are cause for replacement of the rope?
a. 1 broken wire in 6 rope diameters
b. 2 broken wires in 30 rope diameters
c. 3 broken wires in one strand in one lay

,d. 2 broken wires in 6 rope diameters - ✔✔d.


5. What is the net capacity of a crane on main boom unless the manufacturer states otherwise?
a. The capacity listed in the load chart minus the weight of the rigging and all attachments
b. The capacity listed in the load chart plus the weight of the rigging and all attachments
c. The capacity listed in the load chart minus the weight of the rigging and all attachments not in use

d. The capacity listed in the load chart minus the weight of the rigging alone - ✔✔a.


6. What may happen to a properly rigged load when lifted off the ground unless the operator takes
account of boom deflection?
a. It could swing out away from the crane
b. It could swing in towards the crane
c. It could raise absolutely vertically

d. It could shift in its rigging - ✔✔a.


7. What Standard Method hand signal is being illustrated?


a. Swing
b. Stop
c. Emergency Stop

d. Travel - ✔✔a.


8. Who should an operator respond to a "stop" signal from?
a. Appointed signal person only
b. Project manager only
c. Superintendent only

d. Anyone - ✔✔d.


9. Which area do truck cranes without a 5th outrigger generally have no lifting capacity unless the
manufacturer states otherwise?
a. The side

, b. The rear
c. The front

d. The outriggers - ✔✔c.


10. What is the definition of "operating radius?"
a. The distance from the base of the boom to the center of the load b. The distance from the front of the
crane to the center of gravity of the load
c. The distance from the center of rotation of the crane to the center of the load

d. The distance from the center of rotation of the crane to the center of gravity of the load - ✔✔d.


11. What applies to the capacities below the bold line shown on a load chart?
a. They are based on the structural strength of the crane
b. They must not be used
c. They are based on the stability of the crane

d. They should only be used if the crane is set up on outriggers - ✔✔c.


12. In which quadrant are rough terrain crane capacities generally greater?
a. Over the front
b. Over the rear
c. Over the right side

d. Over the left side - ✔✔a.


13. According to federal requirements, under what conditions is it okay for a person to ride the headache
ball?
a. When there is no other way to gain access
b. When the lift has been approved by an engineer
c. When other means would be more dangerous

d. It is never okay - ✔✔d.


14. By what percentage do most manufacturers require a crane's load chart capacity to be reduced by
for duty cycle operations such as high-volume concrete placement?

Geschreven voor

Vak

Documentinformatie

Geüpload op
3 juli 2024
Aantal pagina's
16
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
hov
1.0
(2)

Maak kennis met de verkoper

Seller avatar
hov State University Of West Georgia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12
Lid sinds
2 jaar
Aantal volgers
3
Documenten
2125
Laatst verkocht
2 maanden geleden
Academic Avengers

Expert Verified Exams {Latest Versions} 99% Pass Rate

1.0

2 beoordelingen

5
0
4
0
3
0
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen