CEE 3014 Test 1
Construction Industry Sectors - correct answer-Residential, Commercial, Infrastructure,
Industrial

Residential Construction - correct answer-Tend to be privately funded; designers are
architects; Ex: homes, townhomes, apartments, condos

Commercial Construction - correct answer-Mostly privately funded, some publicly; designers
are architects with help from engineers; Ex: schools, universities, hospitals, offices, theaters,
government buildings

Infrastructure Construction - correct answer-Aka "heavy" or "civil"; usual service life of 50
years; mostly publicly funded; designers are engineers; Ex: dams, tunnels, bridges,
highways, airports

Industrial Construction - correct answer-Mostly privately funded; quality and time are
important measures of success; highly specialized constructors; designers are engineers;
Ex: petroleum refineries, nuclear power plants, steel mills

Main Industry Players - correct answer-Owner, designer, constructor

Public Owners - correct answer-Local, state, federal government

Private Owners - correct answer-Homeowners, multinational companies, developers

Designers - Architects - correct answer-Drafters/CAD/BIM Professionals, specification
writers, interior designers, landscape architects

Designers - Engineers - correct answer-Structural, mechanical, civil, electrical, surveyors

Constructors - correct answer-Project manager, superintendent, foreman, field engineer,
estimators, schedulers, purchasing agents

General Contractor (GC) - correct answer-Assumes responsibility for all the work of the
project; contract with the owner

Specialty Constructors - correct answer-On most projects, they perform most of the
construction work; contract with GC; can be several tiers

Project Manager - correct answer-Responsible for the business end of the project and for
ensuring that the team is in compliance with all contract requirements

Superintendent - correct answer-Jobsite manager responsible for coordinating all production
work and daily activities

, Field Engineer - correct answer-"Assistant superintendent"; responsible for documents and
communication among all parties (submittals, tracking logs, invoices, etc.)

Specialty Contractors - correct answer-Mechanical, electrical, excavation, demolition

Trades - correct answer-Equipment operators, ironworkers, masons, sheetmetal workers,
plasterers, plumbers and pipefitters, electricians, bricklayers, glaziers, roofers, carpenters,
laborers

Miscellaneous Industry Players - correct answer-Authorities having jurisdiction (AHJ) =
authority to issue permits, inspect for compliance with zoning, codes, laws; Manufacturers,
product suppliers; Testing and Inspecting agencies (steel bolts, welds, wind); Commissioning
agents: does project meet design specifications. Required by LEED

Construction Lifecycle - correct answer-Need - Programming - Schematic Design - Detailed
Design - Construction Documents - Bid - Construction - Operation and Maintenance -
Decommission

Construction Manager Meanings - correct answer-General Contracting firms that contract
100% of the project work; Some A&E firms provide Construction Management services;
Construction Managers can be hired consultants who represent the owner's interests; Some
government agencies have employees called Construction Managers

Construction Manager Responsibilities - correct answer-To earn a profit, by providing a
valuable service; Estimate the cost of the project accurately; Predict the schedule of the
work; Control the progress and expenditures during construction; Construct the project
according to plans and specifications; Satisfy the customer re quality, cost, and time

Construction Manager Roles - correct answer-Selecting the right jobs to bid for; Preparing
cost estimates
Submitting bid; Procuring payment, performance bonds; Scheduling the work; Securing
project operating capital; Communicating with owner and designer; Coordinating work of
subcontractors; Managing change orders; Submitting periodic pay estimates; Closing out
project

Owner Roles - correct answer-Identify a need; Define a scope; Define project goals
Ensure availability of sufficient funds; Obtain zoning changes, if needed; Acquire site;
Perform environmental and archaeological impact studies; Determine project delivery
method (important risk-management decision)

Fixed Price - correct answer-Aka "lump sum" or "stipulated sum" agreement; most common;
design must be completed to a point that contractor can provide a reasonably accurate cost
estimate; owner provides construction documents to multiple contractors and awards
contract to lowest responsible and responsive bidder

GMP - correct answer-Guaranteed maximum price; fixed fee that includes actual costs plus
a fee to cover risk; contractor is responsible for cost overruns (unless there has been an
official change order by client that adds to scope)

Geschreven voor

Vak

Documentinformatie

Geüpload op
3 juli 2024
Aantal pagina's
7
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
scholartutor Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
2771
Lid sinds
1 jaar
Aantal volgers
3
Documenten
10727
Laatst verkocht
1 dag geleden

4.8

923 beoordelingen

5
813
4
79
3
20
2
7
1
4

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen