Walmart - Stormwater Exam
The 1970's law that set into place the regulation of stormwater is: - ANS-The Clean
Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - ANS-NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? - ANS-Discharge from contaminated groundwater
The Notice of termination can filed when: - ANS-All construction activity, inside and
outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: - ANS-Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater - ANS-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: - ANS-Groundcover
Temporary stabilization should be implemented - ANS-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is - ANS-To remove sediment from
construction site vehicles and minimize trackout
Common types of erosion include all of the following except - ANS-Sedimentation
Which of the following is NOT a beneficial use of water? - ANS-Flushing a spill down a
storm drain
When installing and maintaining a check dam make sure: - ANS-The low point
(overflow) of the check dam is in the middle of the channel
The 1970's law that set into place the regulation of stormwater is: - ANS-The Clean
Water Act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: - ANS-NPDES
Which of the following is never an allowable stormwater discharge from a construction
site? - ANS-Discharge from contaminated groundwater
The Notice of termination can filed when: - ANS-All construction activity, inside and
outside the building, is complete and permanent stabilization verified
Relative to stormwater permitting, all of the following must occur before construction
starts except: - ANS-Submit the notice of termination (NOT)
Which erosion control best mgmt practice increases water infiltration, dissipates rainfall
energy and slows overland flow of stormwater - ANS-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over is: - ANS-Groundcover
Temporary stabilization should be implemented - ANS-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The Primary purpose of a construction exit is - ANS-To remove sediment from
construction site vehicles and minimize trackout
Common types of erosion include all of the following except - ANS-Sedimentation
Which of the following is NOT a beneficial use of water? - ANS-Flushing a spill down a
storm drain
When installing and maintaining a check dam make sure: - ANS-The low point
(overflow) of the check dam is in the middle of the channel