FDOT QC Manager
Calculate Percent Within Limits - ANS-what is the Standard Deviation used for?
True - ANS-The variance is another mathematical measure of the spread or dispersion
of sample values. True or False?
5.6 - ANS-Based upon the data in Table 1 the RANGE is?
all of the above - ANS-what can non-uniform test results in highway materials be
attributed to? ( sampling variability, material variability, testing variability, production/
placement variability, or all of the above?
all of the above - ANS-under CQC, what is the FDOT responsible for? (providing VT
technicians, approving QC plans, monitoring QC plans, performing resolution, or all of
the above)
The specification requirements - ANS-What are independent verification test results
compared to?
The Engineer - ANS-the random number generator for sampling and testing is to be
provided by:
all of the above - ANS-What does the FDOT quality assurance program require? (
contractor CQC, department verification testing, department resolution testing,
independent verification, or all of the above)
a certificate from the proposed consultant certifying that there is no conflict of interest -
ANS-prior to approving a consultant for contractor quality control, what must the
contractor submit to the department?
construction project administration manual - ANS-where can the departments contractor
quality control plan checklist be found
all of the above - ANS-which of the following is the contractors responsibility for a
project? ( develop the QC plan, provide a QC manager , monitor the QC plan
requirements, maintain an approved QC plan, or all of the above
Calculate Percent Within Limits - ANS-what is the Standard Deviation used for?
True - ANS-The variance is another mathematical measure of the spread or dispersion
of sample values. True or False?
5.6 - ANS-Based upon the data in Table 1 the RANGE is?
all of the above - ANS-what can non-uniform test results in highway materials be
attributed to? ( sampling variability, material variability, testing variability, production/
placement variability, or all of the above?
all of the above - ANS-under CQC, what is the FDOT responsible for? (providing VT
technicians, approving QC plans, monitoring QC plans, performing resolution, or all of
the above)
The specification requirements - ANS-What are independent verification test results
compared to?
The Engineer - ANS-the random number generator for sampling and testing is to be
provided by:
all of the above - ANS-What does the FDOT quality assurance program require? (
contractor CQC, department verification testing, department resolution testing,
independent verification, or all of the above)
a certificate from the proposed consultant certifying that there is no conflict of interest -
ANS-prior to approving a consultant for contractor quality control, what must the
contractor submit to the department?
construction project administration manual - ANS-where can the departments contractor
quality control plan checklist be found
all of the above - ANS-which of the following is the contractors responsibility for a
project? ( develop the QC plan, provide a QC manager , monitor the QC plan
requirements, maintain an approved QC plan, or all of the above