Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

DVP SWPPP Flashcards

Rating
-
Sold
-
Pages
6
Grade
A
Uploaded on
04-07-2024
Written in
2023/2024

DVP SWPPP Flashcards

Institution
Course

Content preview

DVP SWPPP Flashcards

The 1970s law that set into place the regulation of stormwater is - ANS-The clean water
act

Requirements for managing stormwater activity on a construction site are outlined in the
following regulation - ANS-NPDES

Which of the following is never an allowable stormwater discharge from a construction
site - ANS-Discharge from contaminated ground water

The notice of termination can be filed when - ANS-All construction activity, inside and
outside of the building, is complete and permanent stabilization has been verified as
adequate to meet permit requirements

Relative to stormwater permitting all of the following must occur before construction
starts except - ANS-Submit the notice of termination (NOT)

The stormwater notice of intent (NOI) must be submitted - ANS-After the SWPPP is
prepared and before starting construction

Potential pollutant sources stored on a construction site may include - ANS-1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE

The SWPPP inflammation sequence may be modified - ANS-After consulting with the
project SWPPP Designer (CEC) and, if required, the project owner and receiving written
approval

A SWPPP site map will show all of the following except - ANS-Notices of violation

Which of the following information is to be posted at the entrance of the site - ANS-1.
Construction site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE

, Which of the following is NOT A beneficial use of water - ANS-Flushing a spill down a
storm drain

When installing and maintaining a check dam make sure - ANS-The low point (overflow)
of the check dam is in the middle of the channel

To reduce the possibility of undercutting in channels, you should - ANS-Install filter
fabric under rock and similar materials placed within the stormwater conveyance

The good housekeeping section of the SWPP must include all BUT which of the
following - ANS-Post construction stormwater management procedures

Runoff controls include all but which of the following - ANS-Rolled erosion control
products

Which erosion control best management practice increases water filtration, dissipates
rainfall energy and slows over flow of stormwater - ANS-Vegetation

Of the following factors that influence erosion rates, the one a contractor has the most
control over (only select one) is - ANS-Groundcover

Temporary stabilization should be implemented - ANS-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more

The primary purpose of a construction exit is - ANS-To remove sediment from
construction site vehicles and minimize trackout

Common types of erosion include all of the following except - ANS-Sedimentation

Proper spill management should include all of the following EXCEPT - ANS-Installation
of a spill pit on your construction site

The best location for portable toilets on your construction site is - ANS-On ground level,
in low construction traffic areas

The following must be marked on site maps in the job site trailer as work progresses -
ANS-The dates when BMP changes or additions take place

Written for

Course

Document information

Uploaded on
July 4, 2024
Number of pages
6
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GOLDSOLUTIONS Chamberlain College Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
12101
Member since
2 year
Number of followers
61
Documents
17365
Last sold
2 days ago

4.5

119 reviews

5
90
4
9
3
10
2
4
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions