The 1970s law that set into place the regulation of stormwater is - ANS-The clean water
act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation - ANS-NPDES
Which of the following is never an allowable stormwater discharge from a construction
site - ANS-Discharge from contaminated ground water
The notice of termination can be filed when - ANS-All construction activity, inside and
outside of the building, is complete and permanent stabilization has been verified as
adequate to meet permit requirements
Relative to stormwater permitting all of the following must occur before construction
starts except - ANS-Submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted - ANS-After the SWPPP is
prepared and before starting construction
Potential pollutant sources stored on a construction site may include - ANS-1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
The SWPPP inflammation sequence may be modified - ANS-After consulting with the
project SWPPP Designer (CEC) and, if required, the project owner and receiving written
approval
A SWPPP site map will show all of the following except - ANS-Notices of violation
Which of the following information is to be posted at the entrance of the site - ANS-1.
Construction site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE
, Which of the following is NOT A beneficial use of water - ANS-Flushing a spill down a
storm drain
When installing and maintaining a check dam make sure - ANS-The low point (overflow)
of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should - ANS-Install filter
fabric under rock and similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all BUT which of the
following - ANS-Post construction stormwater management procedures
Runoff controls include all but which of the following - ANS-Rolled erosion control
products
Which erosion control best management practice increases water filtration, dissipates
rainfall energy and slows over flow of stormwater - ANS-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over (only select one) is - ANS-Groundcover
Temporary stabilization should be implemented - ANS-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The primary purpose of a construction exit is - ANS-To remove sediment from
construction site vehicles and minimize trackout
Common types of erosion include all of the following except - ANS-Sedimentation
Proper spill management should include all of the following EXCEPT - ANS-Installation
of a spill pit on your construction site
The best location for portable toilets on your construction site is - ANS-On ground level,
in low construction traffic areas
The following must be marked on site maps in the job site trailer as work progresses -
ANS-The dates when BMP changes or additions take place
The 1970s law that set into place the regulation of stormwater is - ANS-The clean water
act
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation - ANS-NPDES
Which of the following is never an allowable stormwater discharge from a construction
site - ANS-Discharge from contaminated ground water
The notice of termination can be filed when - ANS-All construction activity, inside and
outside of the building, is complete and permanent stabilization has been verified as
adequate to meet permit requirements
Relative to stormwater permitting all of the following must occur before construction
starts except - ANS-Submit the notice of termination (NOT)
The stormwater notice of intent (NOI) must be submitted - ANS-After the SWPPP is
prepared and before starting construction
Potential pollutant sources stored on a construction site may include - ANS-1.
Petroleum storage tanks
2. Soil sediments
3. Masonary material
4. ALL OF THE ABOVE
The SWPPP inflammation sequence may be modified - ANS-After consulting with the
project SWPPP Designer (CEC) and, if required, the project owner and receiving written
approval
A SWPPP site map will show all of the following except - ANS-Notices of violation
Which of the following information is to be posted at the entrance of the site - ANS-1.
Construction site notice
2. Permit authorization
3. Location of SWPP
4. ALL OF THE ABOVE
, Which of the following is NOT A beneficial use of water - ANS-Flushing a spill down a
storm drain
When installing and maintaining a check dam make sure - ANS-The low point (overflow)
of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should - ANS-Install filter
fabric under rock and similar materials placed within the stormwater conveyance
The good housekeeping section of the SWPP must include all BUT which of the
following - ANS-Post construction stormwater management procedures
Runoff controls include all but which of the following - ANS-Rolled erosion control
products
Which erosion control best management practice increases water filtration, dissipates
rainfall energy and slows over flow of stormwater - ANS-Vegetation
Of the following factors that influence erosion rates, the one a contractor has the most
control over (only select one) is - ANS-Groundcover
Temporary stabilization should be implemented - ANS-Immediately on all disturbed
areas that are likely to or will remain inactive for 14-days or more
The primary purpose of a construction exit is - ANS-To remove sediment from
construction site vehicles and minimize trackout
Common types of erosion include all of the following except - ANS-Sedimentation
Proper spill management should include all of the following EXCEPT - ANS-Installation
of a spill pit on your construction site
The best location for portable toilets on your construction site is - ANS-On ground level,
in low construction traffic areas
The following must be marked on site maps in the job site trailer as work progresses -
ANS-The dates when BMP changes or additions take place