The Clean Water Act - ANS-The 1970's law that set into place the regulation of storm
water
NPDES - ANS-Requirements for managing storm water activity on a construction site
are outlined in the following regulation
Discharge From Contaminated Ground Water - ANS-Never an allowable discharge from
a construction site
A notice of termination can be filed when? - ANS-All construction activity, inside and
outside of the building is complete. Permanent stabilization has been verified.
The storm water notice of intent must be submitted? - ANS-After the SWPPP is
prepared and before starting construction.
Potential pollutant sources stored on a construction site may include? - ANS-Petroleum
storage tanks, fertilizer, lime, and masonry materials.
The SWPPP implementation sequence may be modified? - ANS-After consulting with
the project SWPPP designer (CEC) and if required, the project owner and receiving
written approval.
A SWPPP site map will show all of the following? - ANS-Location of BMP's, Phasing &
Sequence, Limits of Disturbance
Which of the following information is to be posted at the entrance to the site? -
ANS-Construction site notice, permit authorization, location of SWPPP
Which of the following is not a beneficial use water? - ANS-Flushing water down a storm
drain
When installing and maintaining a check dam make sure...? - ANS-The low point
(overflow) of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should? - ANS-Install filter
fabric under rock & similar materials placed within the storm water conveyance.
water
NPDES - ANS-Requirements for managing storm water activity on a construction site
are outlined in the following regulation
Discharge From Contaminated Ground Water - ANS-Never an allowable discharge from
a construction site
A notice of termination can be filed when? - ANS-All construction activity, inside and
outside of the building is complete. Permanent stabilization has been verified.
The storm water notice of intent must be submitted? - ANS-After the SWPPP is
prepared and before starting construction.
Potential pollutant sources stored on a construction site may include? - ANS-Petroleum
storage tanks, fertilizer, lime, and masonry materials.
The SWPPP implementation sequence may be modified? - ANS-After consulting with
the project SWPPP designer (CEC) and if required, the project owner and receiving
written approval.
A SWPPP site map will show all of the following? - ANS-Location of BMP's, Phasing &
Sequence, Limits of Disturbance
Which of the following information is to be posted at the entrance to the site? -
ANS-Construction site notice, permit authorization, location of SWPPP
Which of the following is not a beneficial use water? - ANS-Flushing water down a storm
drain
When installing and maintaining a check dam make sure...? - ANS-The low point
(overflow) of the check dam is in the middle of the channel
To reduce the possibility of undercutting in channels, you should? - ANS-Install filter
fabric under rock & similar materials placed within the storm water conveyance.