According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor
Certification must be performed? - ANS-Every 12 months (1year)
If visual monitoring is utilized as the means of release detection for single walled tank, it
must be conducted on a _______ Basis. - ANS-Daily
The Purpose of spill and overfill protection equipment is to minimize the potential for a
release during: - ANS-Fuel Deliveries
Under-Dispenser Containment is required for ______ underground storage tank
systems - ANS-All
The following is NOT true for ATG . - ANS-ATG systems are required to be in installed in
all UST systems.
According to CCR title UST regulations spill containment(spill buckets) must meet all of
the following requirements except: - ANS-Be installed on vent risers.
Suction piping may not require leak detection if it has one check valve located where? -
ANS-Directly below the suction pump.
Service Technician performing work on Monitoring equipment must be trained and
certified by __________ - ANS-The manufacture of the equipment.
Air monitoring must be conducted ________ when performing work within a confined
space. - ANS-prior to and during
A UST Service Technician must be recertified by the equipment Manufacture at the time
interval recommended by the equipment manufacture or at least every ____ months,
whichever is greater. - ANS-36 months
(3 years)
When an automatic tank gauge is utilized for single-walled tank leak detection, it shall
test the tank at least monthly after product delivery or when the tank is filled to within
_____ percent of the highest operating level during the previous month. - ANS-10
According to CCR, Title 23 UST Regulations, What is the frequency that the Monitor
Certification must be performed? - ANS-Every 12 months (1year)
If visual monitoring is utilized as the means of release detection for single walled tank, it
must be conducted on a _______ Basis. - ANS-Daily
The Purpose of spill and overfill protection equipment is to minimize the potential for a
release during: - ANS-Fuel Deliveries
Under-Dispenser Containment is required for ______ underground storage tank
systems - ANS-All
The following is NOT true for ATG . - ANS-ATG systems are required to be in installed in
all UST systems.
According to CCR title UST regulations spill containment(spill buckets) must meet all of
the following requirements except: - ANS-Be installed on vent risers.
Suction piping may not require leak detection if it has one check valve located where? -
ANS-Directly below the suction pump.
Service Technician performing work on Monitoring equipment must be trained and
certified by __________ - ANS-The manufacture of the equipment.
Air monitoring must be conducted ________ when performing work within a confined
space. - ANS-prior to and during
A UST Service Technician must be recertified by the equipment Manufacture at the time
interval recommended by the equipment manufacture or at least every ____ months,
whichever is greater. - ANS-36 months
(3 years)
When an automatic tank gauge is utilized for single-walled tank leak detection, it shall
test the tank at least monthly after product delivery or when the tank is filled to within
_____ percent of the highest operating level during the previous month. - ANS-10