California UST Service Technician part 1
July 1 2005, service techs shall possess or work under someone who has a current
certification indicating he or she has passed the ? - ANS-California UST service
technician exam
ICC cert must be renewed every? - ANS-24 months
Service techs must posses or be employed by a person who has the appropriate
contractors license unless? - ANS-The individual has a Tank testing licens
Service tech is defined by any individual who? - ANS-Test UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? - ANS-Approve
comparable alternat training .
UST includes? - ANS-Tank and connected piping
What is considered and UST - ANS-petroleum storage tank
What UST system meets the requirements for secondary containment? - ANS-Doubled
wall tanks
According to title 23; the following piping components if installed after July 1 1987 must
have secondary containment - ANS-Pressured product piping
Considered "pipe" on tanks installed after July 1 2003 - ANS-Pressured product piping
and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems by -
ANS-December 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck
- ANS-Stage 1 vapor recovery
, An approved method for non visual monitoring for existing UST systems. -
ANS-Statistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of ? - ANS-.2 gallons per hour
Manual inventory reconciliation. - ANS-No longer an approved method for non visual
monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with secondary
containment shall be capable of tetecting a leak of ? - ANS-3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? - ANS-At least monthly
According to PEI RP 300 a combustible gas can be used to ? - ANS-Detect vapor leaks
in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should
include? - ANS-Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no
more then ? - ANS-95% full
According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction? - ANS-Depended filter seal damage
According to VR 201 A Breakaway reconnection must be ? - ANS-Logged in GDF log
According to PEI RP 300 the following method of documenting piping location is NOT to
? - ANS-Sketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300 as built drawing or pictures of the underground pipping and
other components shall be ? - ANS-Maintained as long as UST is in service
According to EO VR 101 E maintance records are required to include? - ANS-Name
and designated UST operator .
The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST system be -
ANS-Used with no more then 3 p/v valves
July 1 2005, service techs shall possess or work under someone who has a current
certification indicating he or she has passed the ? - ANS-California UST service
technician exam
ICC cert must be renewed every? - ANS-24 months
Service techs must posses or be employed by a person who has the appropriate
contractors license unless? - ANS-The individual has a Tank testing licens
Service tech is defined by any individual who? - ANS-Test UST monitoring equipment
Trouble shoots UST systems
Installs UST monitoring equipment
If the manufacturer training no longer exist , the local angency may? - ANS-Approve
comparable alternat training .
UST includes? - ANS-Tank and connected piping
What is considered and UST - ANS-petroleum storage tank
What UST system meets the requirements for secondary containment? - ANS-Doubled
wall tanks
According to title 23; the following piping components if installed after July 1 1987 must
have secondary containment - ANS-Pressured product piping
Considered "pipe" on tanks installed after July 1 2003 - ANS-Pressured product piping
and below ground vapor recovery
Under dispenser containment (UDC) was required for all UST systems by -
ANS-December 31 2003
System for exchanging gas vapors in a storage tank and product in a fuel delivery truck
- ANS-Stage 1 vapor recovery
, An approved method for non visual monitoring for existing UST systems. -
ANS-Statistical Inventory Reconciliation (SIR)
ATG must be capable for detecting a release of ? - ANS-.2 gallons per hour
Manual inventory reconciliation. - ANS-No longer an approved method for non visual
monitoring on existing UST systems
Automatic line leak detectors installed on underground piping with secondary
containment shall be capable of tetecting a leak of ? - ANS-3 gallons per hour at 10 psi
ATG should be programmed to test the tank ? - ANS-At least monthly
According to PEI RP 300 a combustible gas can be used to ? - ANS-Detect vapor leaks
in a vapor recovery system.
According to PEI RP 300. A written scope of work for vapor recovery installation should
include? - ANS-Construction plans
Positive shut off overfill protection device must stop the flow of fuel when the tank is no
more then ? - ANS-95% full
According to EO VR 201 A What could cause a nozzle shut off mechanism or
malfunction? - ANS-Depended filter seal damage
According to VR 201 A Breakaway reconnection must be ? - ANS-Logged in GDF log
According to PEI RP 300 the following method of documenting piping location is NOT to
? - ANS-Sketch a diagram on the inside cover of vapor recovery equipment manual
According to PEI RP 300 as built drawing or pictures of the underground pipping and
other components shall be ? - ANS-Maintained as long as UST is in service
According to EO VR 101 E maintance records are required to include? - ANS-Name
and designated UST operator .
The Phil-Tite EVR phase 1 system require that vapor vent pipes at any UST system be -
ANS-Used with no more then 3 p/v valves