Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

California ICC Technician Questions & answers

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A+
Geüpload op
04-07-2024
Geschreven in
2023/2024

California ICC Technician Questions & answers

Instelling
Vak

Voorbeeld van de inhoud

California ICC Technician

1. I do a ____ after replacing a spout to a Healy 900 nozzle - ANS-shut off test

2. In a balance hose the gasoline flows in - ANS-Inner hose

3. After the installation of the vapor piping and before back filling, PEI 300 suggests
some methods to document piping layout, except? - ANS-Drawing with a pen, pipe
layout on the cover of the tank manual.

4. During VO-1000 you don't - ANS-Work without eye protection

5. An Overfill Alarm device needs to be located - ANS-Where it can be heard or seen by
the delivery location.

6. When in a GDF you can avoid the installation of UDC? - ANS-No exceptions of any
GDF.

7. What is considered an Underground Storage Tank? - ANS-Tank and pipping only

8. Gasoline vapors are 3/4 times _____ than air - ANS-Heavier

9. Compounds with a high vapor pressure such as gasoline will evaporate readily and
will typically - ANS-Have a low Flashpoint.

10. The ____ is the valve that controls pressure and vacuum on the tank. - ANS-P/V
Valve

11. The vapor piping must be all, but not - ANS-Compatible with underground
environment.

12. The Shear Valve is installed ____ - ANS-At the base of the dispenser.

13. What is the max length of a Healy Hose Phase 2? - ANS-20 Feet.

14 A ___ is a component of the hanging hardware that separates when it's applied a
force? - ANS-Breakaway.

, 15. UL listed means all except : - ANS-Worldwide Approved.

16. After a drive off, a technician should not - ANS-Ask attendant to fill out a drive off
accident report.

17. The executive order 201-A says that the reconnection of the breakaway needs to be
- ANS-Logged in the maintenance GDF.

18. What is not a secondary containment testing method? - ANS-Statistical Inventory
Reconciliation.

19. The air clean seperator must be located in the GDF - ANS-No more than 100 ft from
the vent riser.

20. The PEI-500 recommends that to avoid being shocked by electricity or soaked with
gasoline that? - ANS-You must disconnect power to all electric devices.

21. Which of these refer to a vapor recovery stage 1? - ANS-Delivery of gasoline and
UST.

22. Which is not part of the hanging hardware? - ANS-Shear Valve

23. What is not apart of a stage 2 vapor recovery? - ANS-Monitoring equipment

24. To install a Healy Z083B Vapor Vac Kit you need the following tools except -
ANS-Stretching copper tool

25. After July 1 2004 continuous monitoring on secondary containment is required on? -
ANS-Tanks, sumps, UDC where single wall pipe is present.

26. The 1/8 inch of foot slope in vapor pipping may not be applied if? - ANS-Should
always apply to avoid blocks.

27. What is the minimum nominal internal diameter for a vapor riser stage 2? - ANS-1"

28. What should you do in case of a large spill and you are waiting for the emergency
response? - ANS-Try to clean and contain the spill as much as possible.

29. A secondary containment on vent lines is not required if? - ANS-A ball float will stop
delivery at 90% tank capacity.

Geschreven voor

Vak

Documentinformatie

Geüpload op
4 juli 2024
Aantal pagina's
7
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
GOLDSOLUTIONS Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
12383
Lid sinds
2 jaar
Aantal volgers
61
Documenten
17415
Laatst verkocht
17 uur geleden

4.5

123 beoordelingen

5
93
4
10
3
10
2
4
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen