Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Ultimate 4th Class Part A Power Engineering Study Guide (Rated 100% correct)

Rating
-
Sold
-
Pages
52
Grade
A+
Uploaded on
04-07-2024
Written in
2023/2024

Ultimate 4th Class Part A Power Engineering Study Guide (Rated 100% correct)

Institution
Course

Content preview

Ultimate 4th Class Part A Power
Engineering Study Guide (Rated 100%
correct)




Which of the following is not a definition of a power plant? ANS - Any one or more boilers in which
steam or other vapour

is generated at less than 57 kPa (8 psi).



Early government involvement in certification of power

engineers became more important for the following reasons

except: ANS - pollution



Which of the following is not characteristic of increased automation in power plants? ANS - manual
flame checking



"Power plant" means ANS - any one or more boilers in which steam or other vapour is generated at
more than 103 kPa (15 psi).



Power engineers are ANS - skilled workers who operate and maintain the equipment in a power plant.



In the early days, owners of power plants hired __________

workers, who started out doing manual labour and through

acquired experience they were promoted to jobs with gradually

increasing levels of skill. ANS - unskilled

,In order to produce greater efficiency, higher boiler

pressures were used and this led to __________ due to

employing of unqualified operators in a power plant. ANS - serious accidents



Which of the following is not a common work schedule for

power engineers? ANS - Seasonal lay-offs



When oil mixes with water in the boiler the resultant effect

is: ANS - serious foaming



The holder of a Certificate of Competency, the

classification of which authorizes him or her to act as a

engineer, may sketch, construct, install, operate, repair,

and give advice on all things pertaining to any __________ in

which that person is employed. ANS - power plant



Power engineers can usually expect to work ANS - rotating shifts.



In a power plant, the power engineer may function as a

supervisor who directs others in the __________ operation on

a shift. ANS - safe and efficient



Committees which establish standards are composed primarily

of which of the following elements? ANS - experts from the industry, professional and insurance groups
and all levels of government



Which of the following certificates of competency qualifies

the holder to take charge of the general care and operation

of any power plant as chief steam engineer, and to supervise

,the engineers in that plant and take charge of a shift in any

power plant as shift engineer? ANS - First Class Engineer's Certificate of Competency



Which of the following duties is a holder of a Fourth Class

Engineer's Certificate of Competency not qualified to

perform? ANS - Take charge of a shift in a power plant having a capacity

of more than 10,000 kW, as shift engineer.



Which of the following is required in order to progress to a

higher certificate? ANS - Education, experience, and the next lower level

certificate.



The IAO is an organization who's primary concern is: ANS - lowering of insurance costs through
standardization



In the early days, the following two agencies got involved in

the certification of both power plant operators and equipment

due to the many accidents that were caused by employing

unqualified operators and improper use of equipment in power

plants: ANS - insurance underwriters and governments



Unqualified individuals operating a power plant or pressure

plant risk the __________ of the plant and the general

public. ANS - safety



In Alberta, the Safety Codes Act established the following

classes of Power Engineer's certificates (Other provinces and

territories have also established the same structure for

these certifications.) ANS - First, Second, Third, and Fourth

, A Fourth Class Power Engineer's certificate of competency

qualifies the holder to take charge of a shift in a power

plant having a capacity of not more than __________ kW, as a ANS - 5,000



A Fourth Class Power Engineer's certificate of competency

qualifies the holder to take charge of a shift in a power

plant consisting of one or more coil type drumless boilers

having an aggregate capacity of not more than __________ kW,

when used for the sole purpose of underground thermal

flooding in oil fields, as shift engineer. ANS - 10 000



A Fourth Class Power Engineer's Certificate of Competency

qualifies the holder to take charge of the general care and

operation of a power plant having a capacity of not more than

__________ kW as chief steam engineer, and to supervise the

engineers in that plant. ANS - 5,000



Which of the following is a symbol for a unit of

thermodynamic temperature? ANS - K



A mole refers to a quantity of: ANS - Amount of substance



The basic unit of mass in the SI system is ANS - kilograms



The basic unit of length in the SI system is ANS - meters



The basic unit of time in the SI system is ANS - seconds

Written for

Course

Document information

Uploaded on
July 4, 2024
Number of pages
52
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$26.89
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Professorkaylee Stanford University
Follow You need to be logged in order to follow users or courses
Sold
53
Member since
1 year
Number of followers
5
Documents
9455
Last sold
1 week ago
ON A TIGHT DEADLINE? GET YOUR BEST RESOURCES HERE WITH: PROFESSOR KAYLEE.

Hello am professor KAYLEE!!! Looking for the best study guides and most convenient Exam & answer packages, Assignment guided solutions and more. I have developed a range of study materials that cover all aspects of Courses, Study faster & better. My materials are designed to provide clear and concise explanations of complex concepts, with plenty of helpful examples and practice problems to reinforce your learning. If you find my documents to be helpful, kindly write a review! Refer other learners so that they can also benefit from my study materials." Thank you in advance for your purchase.

Read more Read less
3.4

14 reviews

5
5
4
1
3
4
2
2
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions