Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

Maryland Asbestos Exam 100% Correct Answers Verified Latest 2024 Version

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
06-07-2024
Written in
2023/2024

The lean ratio of an extension ladder - 4:1 According to AHERA, to complete a response action of a non-NESHAP size project, how many samples must be taken with results of what? - 5 samples taken inside with results of each 0.0 f/cc What are the notification requirements in Virginia? - 20 calendar days for any project greater than 10 sq feet or linear feet In what jurisdiction do individuals need an asbestos supervisor or working linsense - Need a license everywhere Type of bond that would ensure that the general contractor will compensate subcontractors for labor and materials - Performance Bond Minimum respiratory protection on a class 1 asbestos project with no NEA - Full face air purifying respirator What is the maximum content permitted in the work area where an air purifying respirator is being worn? - 23.5% Chest XRays must be evaluated by what class reader? - Class B What is the APF for a full face air purifying respirator - 50 Friable ACM is any material that can be: - Crushed, pulverized, reduced to powder by hand pressure when dry The OSHA permissible exposure limit is - 0.1 f/cc over 8 hours TWAAccording to ASHERA, how many air samples must be taken for final clearance for NESHAP size project? - 13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM Laboratories that perform PLM and TEM must be accredited by - National Voluntary Laboratory Accreditation Program AHERA is for - Public schools K-12 What is the notification requirement for asbestos projects in DC - 10 working days prior to start NESHAP size projects and any project over 18 square feet of flooring. Building owner to notify tenants no less than 30 days prior to start of the project in writing What is a NESHAP sized project - 160 square feet, 260 linear feet, or 35 cubic feet The competent person must inspect the work suits of the crew at least: - Once a shift In Maryland, the asbestos project notification must be posted when and where? - Three days prior to any asbestos project, at all entrances and exits from the work site. NESHAP regulations provide definitions for - Renovations, Adequately Wet, and Demolitions The definition of PACM is - TSI and surfacing material found in a building constructed no later than 1980 The OSHA Asbestos in construction standard required employees to maintain exposure monitoring results for how many years? - 30 years What is the safe level of asbestos exposure? - There is no safe limit What is the purpose of aggressive air sampling? - Simulates the conditions in the work area

Show more Read less
Institution
Course

Content preview

Maryland Asbestos Exam | 100% Correct
Answers | Verified | Latest 2024 Version
The lean ratio of an extension ladder - ✔✔4:1


According to AHERA, to complete a response action of a non-NESHAP size project, how many samples
must be taken with results of what? - ✔✔5 samples taken inside with results of each <0.0 f/cc



What are the notification requirements in Virginia? - ✔✔20 calendar days for any project greater than 10
sq feet or linear feet



In what jurisdiction do individuals need an asbestos supervisor or working linsense - ✔✔Need a license
everywhere


Type of bond that would ensure that the general contractor will compensate subcontractors for labor
and materials - ✔✔Performance Bond



Minimum respiratory protection on a class 1 asbestos project with no NEA - ✔✔Full face air purifying
respirator


What is the maximum content permitted in the work area where an air purifying respirator is being
worn? - ✔✔23.5%


Chest XRays must be evaluated by what class reader? - ✔✔Class B



What is the APF for a full face air purifying respirator - ✔✔50



Friable ACM is any material that can be: - ✔✔Crushed, pulverized, reduced to powder by hand pressure
when dry



The OSHA permissible exposure limit is - ✔✔0.1 f/cc over 8 hours TWA

, According to ASHERA, how many air samples must be taken for final clearance for NESHAP size project? -
✔✔13 samples (5 inside, 5 outside, 2 fields blanks , one sealed blank)TEM



Laboratories that perform PLM and TEM must be accredited by - ✔✔National Voluntary Laboratory
Accreditation Program



AHERA is for - ✔✔Public schools K-12



What is the notification requirement for asbestos projects in DC - ✔✔10 working days prior to start
NESHAP size projects and any project over 18 square feet of flooring. Building owner to notify tenants no
less than 30 days prior to start of the project in writing



What is a NESHAP sized project - ✔✔160 square feet, 260 linear feet, or 35 cubic feet



The competent person must inspect the work suits of the crew at least: - ✔✔Once a shift



In Maryland, the asbestos project notification must be posted when and where? - ✔✔Three days prior to
any asbestos project, at all entrances and exits from the work site.



NESHAP regulations provide definitions for - ✔✔Renovations, Adequately Wet, and Demolitions



The definition of PACM is - ✔✔TSI and surfacing material found in a building constructed no later than
1980


The OSHA Asbestos in construction standard required employees to maintain exposure monitoring
results for how many years? - ✔✔30 years



What is the safe level of asbestos exposure? - ✔✔There is no safe limit


What is the purpose of aggressive air sampling? - ✔✔Simulates the conditions in the work area

Written for

Course

Document information

Uploaded on
July 6, 2024
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
hussle

Get to know the seller

Seller avatar
hussle Harvard College
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
1 year
Number of followers
1
Documents
1635
Last sold
1 year ago
A+ ExamPrep Essentials

Explore my collection of high quality study guides and exam prep materials. Whether you\\\'re striving for top grades or looking to understand complex topics better, I provide: .Detailed Study Guide .Exam-ready notes .practice Tests .Subject coverage

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions