DBIA EXAM | NEWEST VERSION QUESTIONS WITH COMPLETE AND VERIFIED ANSWERS |ALREADY GRADED A+ | WITH A STUDY GUIDE
2024 | DBIA EXAM | NEWEST VERSION QUESTIONS WITH COMPLETE AND VERIFIED ANSWERS |ALREADY GRADED A+ | WITH A STUDY GUIDE Miller Act 1935 Correct Answer Federal Government passed bond requiring payment and performance bonds on all public works, what year? Brooks Bill 1972 Correct Answer Bill directing A/E's selected on qualifications, what year? Clinger Cohen Act/Defense Procurement Reform Act 1996 Correct Answer Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. Prescriptive Correct Answer Owner requiring specific products or methods be instituted by DB team in order to achieve desired performance. False Correct Answer T/F Detailed estimating is the Building systems approach to estimating False Correct Answer T/F feasibility estimate is cost model and establishes budget for project True Correct Answer T/F key element of quality assurance is keeping communication lines open between owner and DB True Correct Answer T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect False Correct Answer T/F trust is most important thing for DB Schematic estimating Correct Answer DB estimating sequence where 15%-20% of design is completed Trend logs Correct Answer Provides baseline budgets and schedules and list estimate trends Committed Design Correct Answer Drawings and specs are approved by DOR and confirmed within budget Coordinating owner design reviews and approvals Correct Answer What is NOT a design managers role? Design Build Team Correct Answer Who is responsible for ensuring quality assurance? Direct DB Correct Answer When programming and design is developed by DB entity Spearin Doctrine Correct Answer Establishes that under DBB, owner is responsible for increased cost due to defective plans/specs Adjusted low bid Correct Answer Selection where qualitative aspects are scored out of 100 the divided by qualitative score Design criteria DB Correct Answer Owner defines performance data but DB Entity provides design solution Weighted criteria Correct Answer Awarded to proposer with highest combined total points of technical and price proposals Conceptual estimating Correct Answer Estimate provided with very little design Trend estimating Correct Answer Maintains control of budget and design process between major estimate phases Feasibility estimate Correct Answer Owner proforma based on sq ft or ROM estimates Statement of qualifications Correct Answer Determines if proposer is qualified for project with yes or no statement DBIA 501 Correct Answer Contract for Design-Build Consultant Services Standard of Care Correct Answer The level of quality that any average Design Professional would be able to perform given the circumstances. Design Bid Build Correct Answer Slowest Project Delivery method, linear in nature, prescriptive (owner knows what they want), Multi Prime Correct Answer Project Delivery - Many contracts through Owner CM at Risk Correct Answer Project Delivery method allowing the contractor to come on board very early in design for preconstruction services yet maintains separation between Designer and Builder contractually. Design Build Correct Answer Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. Low Bid Correct Answer Procurement Method - Most Familiar Negotiated (Qualifications Based) Correct Answer Procurement Method - Common for A/E
Geschreven voor
- Instelling
- DBIA
- Vak
- DBIA
Documentinformatie
- Geüpload op
- 13 juli 2024
- Aantal pagina's
- 5
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
dbia
-
miller act 1935
-
brooks bill 1972
-
standard of care
-
design bid build
-
dbia exam newest version questions with complete
-
clinger cohen actdefense procurement reform act 1
Ook beschikbaar in voordeelbundel