BCN 3761 Final Exam | With Verified Answers
BCN 3761 Final Exam | With Verified Answers T/F; general conditions produced by professional associations rarely require modifications True Which of the following is not a responsibility of the architect/engineer according to the general conditions determine the scope of work performed by subcontractors Which does not publish preprinted general conditions the construction specifications institute (CSI) T/F; the general conditions are comparable to the "general clauses" in a typical business contract True T/F; general conditions define the rights, responsibilities, and relationships of entities involved in the performance of the contract True T/F; general conditions are an inherent part of the owner-contract agreement True T/F; general conditions direct how the contractor shall prepare applications for progress payments False T/F; general conditions define the role of the construction management True T/F; general conditions are modified by division 01 - general requirements, in the specifications False T/F; the architect/ engineer is a signer of the owner contractor agreement False T/F; general conditions are commonly produced by professional associations True T/F; supplementary conditions modify and expand upon the general conditions true T/F; supplementary conditions prescribe administrative requirements for carrying out duties and responsibilities of the general conditions True T/F; EJCDC general conditions modify AIA general conditions False T/F; supplementary conditions and division 01 general requirements must be coordinated True T/F; supplementary conditions prescribe bidding procedures False T/F; modifications by the supplementary condition to the general conditions should follow the order of topics in the general conditions True T/F; supplementary conditions prescribe specific insurance requirements for the project True T/F; liquidated damages establish responsibilities of the owner and contractor for failures in roofing and waterproofing False T/F; guidance for modifying general conditions with supplementary conditions is available from the American institute of architect (AIA) True T/F; unless modified by supplementary conditions, binding arbitration is required by AIA A201 general conditions for resolution of construction disputes True T/F; dollar limits for construction insurance should be established by the architect/engineer False T/F; requirements for bid bond are expressed as a percentage of the bid amount True T/F; a surety bond guarantees that the contractor will satisfactorily perform according to the contract and will pay its expenses for performing the work True T/F; the meaning of the terms "warranty" and "guaranty" are determined by the author of the general conditions True T/F; special warranties are expanded requirements fulfilled by subcontractors and product manufacturers True T/F; a one year warranty on construction is the same as the one year correction period, according to AIA and EJCDC general conditions False Which of the following is untrue regarding special warranties basic part of the contract T/F; is the contractor fails to complete the work under the contract, the surety bond protects the owner True T/F; requirements for construction bonds and insurance are specified in division 01 general requirements False T/F; laws governing warranties, guarantees, and sureties vary from state to state True Construction contract modifications include which of the following change order and construction change directive T/F; addenda are issued prior to signing of the owner contractor agreement True The purpose of addenda include all but which of the following modify previously adopted change orders T/F; typically methods to describe changes in bidding documents are narrative and revised page True Addenda should include all but which of the following revisions to owner contractor agreement T/F; only the owner has authority to direct a change in contract documents True Change order should contain all but which of the following change in bid date and location
Geschreven voor
- Instelling
- BCN 3761
- Vak
- BCN 3761
Documentinformatie
- Geüpload op
- 16 juli 2024
- Aantal pagina's
- 7
- Geschreven in
- 2023/2024
- Type
- Tentamen (uitwerkingen)
- Bevat
- Vragen en antwoorden
Onderwerpen
-
bcn 3761 final exam
-
bcn 3761 final
-
general conditions
-
which does not publish preprinted
Ook beschikbaar in voordeelbundel