OSHA 30 QUESTIONS AND ANSWERS During steel assembly, shear connectors will be installed _______ metal decking is in place: after During steel assembly, the total weight of a bundle of decking should not exceed 4,000 lbs. T/F true During steel assembly, shear Connectors should not be attached to the top flanges of beams or joists. T/F true During steel assembly, the employer shall ensure that the weight of a bundle of joist bridging shall not exceed a total of: 1,000 lbs When placing solid web members for beams/columns, diagonal bracing may be secured with at least one bolt per connection, wrench-tight. T/F true Subpart R contains numerous references to Tables A and B. These tables refer to erection bridging requirements associated with short and long span joists, and can be found in: Within the standard Subpart R When placing solid web members for beams/columns, the load shall not be released until the members are secured with at least two bolts per connection. T/F true Columns must be equipped with vertical stabilizer plates all of the above Connectors working at heights over 15 and up to 30 feet must tie off with: at least one of the above Deckers in a Controlled Decking Zone must be protected at heights greater than: 2 stories Safety nets must be installed no more than 30 feet below the walking/working surface whenever: all of the above Which of the following is true of a CDZ: all of the above Training must be each of the following EXCEPT: sporadic Training must include: all of the above Training must include procedures for erecting, maintaining, disassembling, and inspecting fall protection systems. T/F true Work from water towers and tanks is exempt from the Steel Erection Standard. T/F true Perimeter safety cables of 1/2 inch wire rope must be installed: both a & b When there is no overhead protection, the _______ must ensure that personnel are not working below steel erection: controlling contractor The weight of a bundle of joist bridging shall not exceed a total of 1,000 pounds. T/F true A pre-work shift visual of cranes must be performed by: a competent person During steel assembly, the bundle of decking is placed on a minimum of ______ joists: 3 Connectors working at heights over 15 and up to 30 feet must tie off with:

Meer zien Lees minder
Instelling
Vak

Voorbeeld van de inhoud

OSHA 30 QUESTIONS AND ANSWERS


During steel assembly, shear connectors will be installed _______ metal decking
is in place:
after
During steel assembly, the total weight of a bundle of decking should not exceed
4,000 lbs. T/F
true
During steel assembly, shear Connectors should not be attached to the top
flanges of beams or joists. T/F
true
During steel assembly, the employer shall ensure that the weight of a bundle of
joist bridging shall not exceed a total of:
1,000 lbs
When placing solid web members for beams/columns, diagonal bracing may be
secured with at least one bolt per connection, wrench-tight. T/F
true
Subpart R contains numerous references to Tables A and B. These tables refer to
erection bridging requirements associated with short and long span joists, and
can be found in:
Within the standard Subpart R
When placing solid web members for beams/columns, the load shall not be
released until the members are secured with at least two bolts per connection.
T/F
true
Columns must be equipped with vertical stabilizer plates
all of the above
Connectors working at heights over 15 and up to 30 feet must tie off with:
at least one of the above

,Deckers in a Controlled Decking Zone must be protected at heights greater than:
2 stories
Safety nets must be installed no more than 30 feet below the walking/working
surface whenever:
all of the above
Which of the following is true of a CDZ:
all of the above
Training must be each of the following EXCEPT:
sporadic
Training must include:
all of the above
Training must include procedures for erecting, maintaining, disassembling, and
inspecting fall protection systems. T/F
true
Work from water towers and tanks is exempt from the Steel Erection Standard.
T/F
true
Perimeter safety cables of 1/2 inch wire rope must be installed:
both a & b
When there is no overhead protection, the _______ must ensure that personnel
are not working below steel erection:
controlling contractor
The weight of a bundle of joist bridging shall not exceed a total of 1,000 pounds.
T/F
true
A pre-work shift visual of cranes must be performed by:
a competent person
During steel assembly, the bundle of decking is placed on a minimum of ______
joists:
3
Connectors working at heights over 15 and up to 30 feet must tie off with:

, at least one of the above
OSHA requires that all equipment left unattended at night, adjacent to a highway
in normal use, must have:
A or B
Bulldozer and scraper blades, end-loader buckets, dump bodies, and similar
equipment, must be fully lowered and never blocked when being repaired or
when not in use. T/F
false
Must be provided on spur railroad tracks where a rolling car could contact other
cars being worked, enter a building, work or traffic area.
Derail and/or bumper blocks
Any overhead wire must be considered to be an energized line UNLESS and
UNTIL person owning line or electrical utility indicate that it is not an energized
line and it has been visibly grounded. T/F
true
OSHA specifies that for overhead power-lines rated 50kV or below, minimum
clearance between the lines and any part of the crane or load must be:
10 feet
Flammable liquids have "flash points" below:
100 degrees Fahrenheit
All haulage vehicles, whose pay load is loaded by means of cranes, power
shovels, loaders, or similar equipment, must have _______ to adequately protect
the operator from shifting or falling materials.
a cab shield and/or canopy
On site motor vehicles must be equipped with at least two headlights and two
taillights in operable condition. T/F
true
No person must use any motor vehicle equipment having an obstructed view to
the rear unless the vehicle has a reverse signal alarm audible above the
surrounding noise level or:
an observer to signal that it is safe to reverse

Geschreven voor

Vak

Documentinformatie

Geüpload op
21 juli 2024
Aantal pagina's
23
Geschreven in
2023/2024
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$8.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TopGradeSolutions Chamberlain College Of Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
94
Lid sinds
2 jaar
Aantal volgers
9
Documenten
13294
Laatst verkocht
4 dagen geleden
TOPGRADESOLUTIONS

Here we offer revised study materials to elevate your educational outcomes. We have verified learning materials (Research, Exams Questions and answers, Assignments, notes etc) for different courses guaranteed to boost your academic results. We are dedicated to offering you the best services and you are encouraged to inquire further assistance from our end if need be. Having a wide knowledge in Nursing, trust us to take care of your Academic materials and your remaining duty will just be to Excel. Remember to give us a review, it is key for us to understand our clients satisfaction. We highly appreciate clients who always come back for more of the study content we offer, you are extremely valued. All the best.

Lees meer Lees minder
4.9

171 beoordelingen

5
159
4
7
3
4
2
0
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen