CQM-C Test Questions with Correct Solutions, A+
The purpose of Construction Quality Management is to: - cORRECT sOLUTION Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. - cORRECT sOLUTION According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: - cORRECT sOLUTION Building trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: - cORRECT sOLUTION Periodically verify that the contractors system of control is working effectively. An effective contractor quality control program will: - cORRECT sOLUTION Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: - cORRECT sOLUTION The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: - cORRECT sOLUTION Require contractors to maintain the quality specified in the plans and specifications. Inspection is: - cORRECT sOLUTION The process by which ongoing and completed work is examined During the punch-out inspection of a project: - cORRECT sOLUTION Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is a disagreement whether the contractors work complies with the contract: - cORRECT sOLUTION The government makes the final determination Characteristics that describe a definable feature of work include: - cORRECT sOLUTION Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements. - cORRECT sOLUTION Follow-up phase
Written for
- Institution
- CQM-C
- Course
- CQM-C
Document information
- Uploaded on
- July 22, 2024
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cqm c test questions with correct solutions a
Also available in package deal