CM 4101 Final Exam | With 100% Correct Answers, Graded A During which of the following process, questions such as what activities should be scheduled are typically asked and answered? a. Planning b. Scheduling c. Control Using traditional bar charts, it is always easy to tell the logic relationships between activities. a. True b. False An event consumes a. Resources b. Time c. Both Resources and Time d. Neither resources nor time Which of the following is correct regarding CPM and PERT? a. The calculations in CPM are non-deterministic and those in PERT are deterministic b. The calculations in CPM are deterministic and those in PERT are non-deterministic c. The calculations in both are deterministic d. The calculations in both are non-deterministic Assume A is a milestone of a project, which of the following statement(s) can be true? a. A may take 3 days b. A needs one mason and two helpers to finish c. A costs $2,000 d. A can at least be crashed by 1 day c. None of the above An activity's scheduled early start time is at the beginning of day 10. Its duration is 5 days. Its total float is 7 days. If the activity is actually finished at the end of day 21, which of the following statement(s) must be true? a. The project will be delayed because of this activity b. The status of this activity will not cause a possible delay to the entire project c. The early start time of the successors of this activity will be delayed d. None of the above The forward pass along in the Critical Path Method can be used to determine a. Total Float b. Activity early finish time c. Activity late finish time d. None of the above Arrow diagrams use link to represent activities a. True b. False Choose all that are NOT true to a non-critical activity (Assume the total float of critical activities is zero) a. Total float is not equal to zero b. Total float is smaller than free float c. Free float is always equal to zero d. Lag is always equal to zero e. None of the above After resource leveling, the duration of a project may be changed? a. True b. False c. Cannot be determined A significant difference between "planning" and "scheduling" is: a. Scheduling determines what is going to be done, and planning determines how to do b. Scheduling determines how to do, and planning determines what to do c. Scheduling determines when to do, and planning determines what to do, how to do, and by whom d. Scheduling determines how to do, and planning determines by whom What is not true about classic bar charts? a. Bar charts use a time-scaled presentation b. Bar charts often directly show resource consumption of each activity c. Bar charts can show the relative of each activity d. Bar charts cannot show the actual status of a project What statements about a work breakdown structure (WBS) are true? a. A WBS describes the entire scope of a project b. A WBS helps to organize project activities c. The development of a WBS is a bottom up process, i.e., from project details and up d. A WBS usually needs to consider who is going to do a particular task a. A WBS describes the entire scope of a project What is a major difference between an arrow diagram and a precedence diagram? a. An arrow diagram uses a network representation, and a precedence diagram does not b. An arrow diagram supports critical path analysis, and a precedence diagram does not c. An arrow diagram uses links to represent activities, and a precedence diagram does not d. An arrow diagram uses a node to represent a connection between two activities, and a precedence diagram does not What is not true about an activity? a. An activity usually takes time b. An activity may consume resources c. An activity usually has a start time and a finish time d. An activity usually does not need to be measurable A critical activity is the one that has: a. No float b. Positive float c. Negative float d. None of the above What is not true about an event? a. An event usually takes times b. An event usually consumes resources c. An event is not an activity d. An event has a start time and a finish time What are the major types of activities? a. Production/Construction b. Procurement c. Management

Show more Read less
Institution
CM 4101
Course
CM 4101

Content preview

CM 4101 Final Exam


During which of the following process, questions such as what activities should be
scheduled are typically asked and answered?

a. Planning
b. Scheduling
c. Control

Using traditional bar charts, it is always easy to tell the logic relationships between
activities.

a. True
b. False

An event consumes

a. Resources
b. Time
c. Both Resources and Time
d. Neither resources nor time

Which of the following is correct regarding CPM and PERT?

a. The calculations in CPM are non-deterministic and those in PERT are deterministic
b. The calculations in CPM are deterministic and those in PERT are non-deterministic
c. The calculations in both are deterministic
d. The calculations in both are non-deterministic

Assume A is a milestone of a project, which of the following statement(s) can be true?

a. A may take 3 days
b. A needs one mason and two helpers to finish
c. A costs $2,000
d. A can at least be crashed by 1 day
c. None of the above

An activity's scheduled early start time is at the beginning of day 10. Its duration is 5
days. Its total float is 7 days. If the activity is actually finished at the end of day 21,
which of the following statement(s) must be true?

a. The project will be delayed because of this activity
b. The status of this activity will not cause a possible delay to the entire project

, c. The early start time of the successors of this activity will be delayed
d. None of the above

The forward pass along in the Critical Path Method can be used to determine

a. Total Float
b. Activity early finish time
c. Activity late finish time
d. None of the above

Arrow diagrams use link to represent activities

a. True
b. False

Choose all that are NOT true to a non-critical activity (Assume the total float of critical
activities is zero)

a. Total float is not equal to zero
b. Total float is smaller than free float
c. Free float is always equal to zero
d. Lag is always equal to zero
e. None of the above

After resource leveling, the duration of a project may be changed?

a. True
b. False
c. Cannot be determined

A significant difference between "planning" and "scheduling" is:

a. Scheduling determines what is going to be done, and planning determines how to do
b. Scheduling determines how to do, and planning determines what to do
c. Scheduling determines when to do, and planning determines what to do, how to do,
and by whom
d. Scheduling determines how to do, and planning determines by whom

What is not true about classic bar charts?

a. Bar charts use a time-scaled presentation
b. Bar charts often directly show resource consumption of each activity
c. Bar charts can show the relative of each activity
d. Bar charts cannot show the actual status of a project

Written for

Institution
CM 4101
Course
CM 4101

Document information

Uploaded on
August 4, 2024
Number of pages
7
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bri254 Rasmussen College
Follow You need to be logged in order to follow users or courses
Sold
919
Member since
5 year
Number of followers
738
Documents
3524
Last sold
2 weeks ago
Best Tutorials, Exam guides, Homework help.

When assignments start weighing you down, take a break. I'm here to create a hassle-free experience by providing up-to-date and recent study materials. Kindly message me if you can't find your tutorial and I will help.

4.0

181 reviews

5
106
4
20
3
25
2
6
1
24

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions