the cost or time difference between the actual project performance and
planned project performance Answer - variance
what is not possible of cost overruns? Answer - material price escalation
materials prices are locked in with a purchase order, and vendors will usually
honor their price quotes for______ to_______ Answer - 30-90
which is the most predictable of project planning and project control. it has a
significant influence on both time and cost Answer - productivity
the _____ is the tool used to track progress throughout the construction
process. it identifies the critical activities' start and finish dates Answer -
schedule
it is probably the most common and most obvious reason for work slowdown
resulting in cost overruns Answer - weather conditions
it can be one of the most insidious factors influencing project performance
Answer - change orders
it is certainly one that can be avoided with proper control. it is not the workers
are on the job ready to start the project Answer - defective material