Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers Louisiana State Universit1

Rating
4.0
(1)
Sold
-
Pages
9
Grade
A+
Uploaded on
15-08-2024
Written in
2024/2025

LSU CM 4100 Construction Scheduling and Cost Control final exam questions and answers Louisiana State Universit1

Institution
Course

Content preview

LSU CM 4100 Construction Scheduling and Cost
Control final exam questions and answers Louisiana
State University

All of the following are functions of Construction Management except: - ANSWER
Financing the project

Which is not a part of the three legged stool of construction? - ANSWER Efficiency

Which of the following is the definition for project scope? - ANSWER Sets the
parameters for the work and defines what work needs to be done

Which of the following is NOT a Project Delivery method? - ANSWER Agency CM

What sums up the role of the Quality Surveyor? - ANSWER Works with the senior
estimator, must have a good understanding of the construction process, & must be
able to read plans

Which of the following is considered a trait of a good Construction Manager? -
ANSWER Tenacious, Risk-taker, & Business Knowledge

Who determines what method of delivery is used on a project? - ANSWER Owner

What sums up the role of an Area Superintendent? - ANSWER Assists the Project
Superintendent on large projects

What sums up the role of a Field Engineer? - ANSWER Works directly for the
superintendent, Responsible for project layout and dimensional accuracy, &
Responsible for communication with subcontractors

What is the best description of Design-Build Construction? - ANSWER The owner
contracts with a design/build entity, which is responsible for the project

Open bidding is required on public projects because________? - ANSWER They
are funded by taxpayer dollars

What is the tool used to reduce the number of bidders on a public project and to
increase the quality of the contract pool? - ANSWER Prequalification

Which type of bond guarantees that the payment for a contractor's labor and
materials used on the project will be made? - ANSWER Labor and Materials Bond

Where are the notice documents that inform the public of upcoming projects found? -
ANSWER Posted electronically on construction project lead services, & Trade
Magazines

, Identify the correct pairing of the most common procurement method and selection
criteria? - ANSWER Design-Bid-Build and Low Bid Selection

What is the name of the official document that notifies the contractor to start
construction? - ANSWER Need to Proceed

Which best describes the weighted criteria evaluation process? - ANSWER Award
the project based on low total points for qualitative and price components

Which are factors that are commonly considered before deciding to bid on a
construction job? - ANSWER Location of the project, Size of the job, & Who the
architect/owner is

If missing, which one of the below items would deem a bid non responsive? -
ANSWER Bid Bond, Certificates of Insurance, & Subcontractors List

Narrowing the field of offers through the selection of the most qualified proposers on
the basis of qualifications is know as: - ANSWER Shortlisting

Who is involved in the production of the project drawings? - ANSWER Architect,
Civil Engineer, & Structural Engineer

Which of the following would you NOT expect to find on the drawings when a project
is put out for bid? - ANSWER Contractor's Name

Which of the following drawings takes precedence if a discrepancy occurs in the
plans? - ANSWER Detail Drawing

Which of the following is included in the bidding documents? - ANSWER
Advertisement to bidders, Instruction to bidders, & Agreement form

Which of the following is NOT discussed in the technical specifications? - ANSWER
Owner provided materials

Which of the following contract types is most popular with Design-Build project
delivery? - ANSWER Guaranteed maximum price

Which of the following would you expect to find in the supplementary conditions? -
ANSWER Soil testing information, Job signage requirements, & Phasing
requirements

In CSI MasterFormat, which division contains "finishes"? - ANSWER Division 9

Which of the following contracts is the most common on construction projects? -
ANSWER Lump Sum

Who determines the type of contract to be used on a construction project? -
ANSWER Owner

Written for

Course

Document information

Uploaded on
August 15, 2024
Number of pages
9
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$18.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF


Also available in package deal

Reviews from verified buyers

Showing all reviews
1 year ago

4.0

1 reviews

5
0
4
1
3
0
2
0
1
0
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
michealmuthii Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
13
Member since
1 year
Number of followers
2
Documents
615
Last sold
1 month ago
EXCELLENT HOMEWORK HELP AND TUTORING

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that\'s why i\'m one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Read more Read less
4.6

386 reviews

5
257
4
100
3
26
2
3
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions