Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Test Bank for Project Management A Systems Approach to Planning, Scheduling and Controlling 12th Edition By Kerzner, Harold (All Chapters, 100% Original Verified, A+ Grade)

Beoordeling
-
Verkocht
-
Pagina's
64
Cijfer
A+
Geüpload op
20-08-2024
Geschreven in
2024/2025

This Is Original 12th Edition of Test Bank From Original Author. All Other Files in the market are fake/old Edition. Other Sellers Have changed old Edition Number to new But Test Bank is old Edition. Test Bank for Project Management A Systems Approach to Planning, Scheduling and Controlling 12th Edition By Kerzner, Harold (All Chapters, 100% Original Verified, A+ Grade) Test Bank for Project Management A Systems Approach to Planning, Scheduling and Controlling 12th Edition By Kerzner, Harold (All Chapters, 100% Original Verified, A+ Grade)

Meer zien Lees minder
Instelling
Project Management A Systems Approac
Vak
Project Management A Systems Approac

Voorbeeld van de inhoud

Project Management A Systems Approach to Planning, Scheduling, and
Controlling, 12e Kerzner, Harold (Test Bank All Chapters, 100%
Original Verified, A+ Grade)

CHAPTER 1: OVERVIEW
(Difficulty: E = easy, M = medium, H = hard)

(E) 1. In today’s market, which of the following industries appears to have a need for project
management?
A. Aerospace and defense
B. Construction
C. Information systems
*D. All industries have a need for project management

(M) 2. Which of the following is not one of the PMBOK Guide’s five process groups?
*A. Feasibility studies
B. Planning
C. Execution
D. Closure

(E) 3. Which of the following is normally not one of the traditional components of the triple
constraint?
A. Within time
B. Within cost
C. Within performance (scope, technology or quality)
*D. Accepted by the customer

(M) 4. Which of the following is a potential benefit of using project management?
A. Maximization of continuous reporting
B. No need for identification of functional responsibilities
*C. Identification of time limits for scheduling
D. No need for a project management methodology

(E) 5. Which of the following functions of classical management is generally not performed
by the project manager?
A. Planning
B. Organizing
*C. Staffing
D. Controlling

,(M) 6. Which of the following three types of deliverables discussed in the book would be
used to classify the final report that must be presented to the customer at the end of the
project?
A. Hardware deliverables
*B. Software deliverables
C. Interim deliverables
D. Validation deliverables

(E) 7. Which of the following are not organizational stakeholders?
A. Executive officers
B. Unions
C. Employees
*D. Customers

(E) 8. Which of the following are not product/market stakeholders?
*A. Creditors
B. Customers
C. Suppliers
D. Governments

(E) 9. Which of the following are not capital market stakeholders?
A. Banks
*B. Unions
C. Shareholders
D. Creditors

(M) 10. Which of the following is directly controlled by the project manager?
A. Money
B. Manpower
C. Information/technology
*D. None of the above

(H) 11. Which of the following is reflective of the changes in project management according
to Dr. Thamhain?
A. Moving from dynamic to linear processes

, *B. Moving toward full utilization of information technology
C. Moving away from the use of an enterprise-wide methodology
D. Moving from effectiveness to efficiency

(E) 12. Successful project management requires a good daily working relationship between
project and line managers.
*A. True
B. False

(E) 13. Successful project management does not require that people understand how to report
to multiple bosses.
A. True
*B. False

(E) 14. The project manager’s role as an integrator of activities does not include integration of
activities necessary to:
A. Develop the plan
B. Execute the plan
C. Make changes to the plan
*D. All of above are PM roles.

(M) 15. The PM’s role with regard to interface management does not include interfacing:
A. Within the project team
B. Between the project team and functional organizations
C. Between the project team and senior management
*D. Between senior management and various external stakeholders

(H) 16. Which of the following is the role of the PM rather than the role of the functional
manager?
*A. What work will be done
B. How the work will be done
C. Who will do it
D. Where it will be done

, (E) 17. Which of the following problems affects the functional manager’s ability to staff and
support a project during execution?
A. Limited availability of resources
B. Predetermined deadlines
C. Unscheduled changes to the project plan
*D. All of the above

(H) 18. What type of project manager would have employees (i.e., team members) that report
directly to the project manager full-time for the duration of the project?
A. Lightweight team leader
B. Heavyweight team leader
*C. Tiger team leader
D. Leopard team leader

(H) 19. When team members take direction from both the project and line managers, the type
of project manager is usually a:
A. Lightweight team leader
*B. Heavyweight team leader
C. Tiger team leader
D. Leopard team leader

(H) 20. On a project headed up by a lightweight project manager, employees have their
performance reviews made by:
*A. Line managers only
B. Line managers with input from the project managers
C. Concurrence jointly by project managers and line managers
D. Project managers only

(H) 21. Which of the following is normally not part of a team member’s role?
A. Accepting responsibility for a deliverable
*B. Sharing information with the sponsor
C. Sharing information with the team
D. Completing the work at the earliest possible time.

Geschreven voor

Instelling
Project Management A Systems Approac
Vak
Project Management A Systems Approac

Documentinformatie

Geüpload op
20 augustus 2024
Aantal pagina's
64
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$26.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
studentsupport96 Air University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
353
Lid sinds
1 jaar
Aantal volgers
10
Documenten
539
Laatst verkocht
17 uur geleden
Student.Support

Best Online Store in the World for Study Materials Sale. Nineteen Years of Teaching Experiences in Major Subjects. Our team is one of the best talented team in making notes for A+ Grade Results. You can get all your required Study Resources in our Store.

4.4

32 beoordelingen

5
22
4
5
3
3
2
0
1
2

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?