An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all tasks is 18 minutes. The line will operate for 450 minutes per day. a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.) Minimum cycle time minutes Maximum cycle time minutes b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal place. Enter the smaller value in the first box and the larger value in the second box.) Range of output to units/day c. What is the minimum number of workstations needed if the maximum output rate is to be sought? (Round up your answer to the next whole number.) Minimum number of workstations d. What cycle time will provide an output rate of 125 units per day? (Round your answer to 1 decimal place.) Cycle time min/cycle e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes? Cycle TimePotential Output (1) units (2) units As part of a major plant renovation project, the industrial engineering department has been asked to balance a revised assembly operation to achieve an output of 240 units per eight-hour day. Task times and precedence relationships are as follows: TaskDuration (minutes)Immediate Predecessor a0.2- b0.4a c0.2b d0.4- e1.2d f1.2c g1.0e, f Do each of the following: b. Determine the minimum cycle time, the maximum cycle time, and the calculated cycle time. (Round your answers to 1 decimal place.) The minimum cycle time minutes per unit The maximum cycle time minutes per unit Calculated cycle time minutes per unit c. Determine the minimum number of stations needed. (Round your answer to the next whole number.) Minimum number of stations d. Assign tasks to workstations on the basis of greatest number of following tasks. Use longest processing time as a tiebreaker. If ties still exist, assume indifference in choice. Work stationsFollowing Tasks I (Click to select) D, C, A A, B, C,D A D, B, C A, B, D, C II (Click to select) C, F, B D, C, A A B,E E III (Click to select) B F, G E F C IV (Click to select) E, F C, D A, B, C E G e. Compute the percentage of idle time for the assignment in part d. Use the actual bottleneck cycle time in your calculation. (Round your answer to 2 decimal places. Omit the "%" sign in your response.) Percentage of idle time % Problem 6-7 For the set of tasks given below, do the following: TaskTask Time(seconds)Immediate Predecessor A 45 - B 11 A C 9 B D 50 - E 26 D F 11 E G 12 C H 10 C I 9 F, G, H J 10 I 193 b. Determine the minimum and maximum cycle times in seconds for a desired output of 500 units in a seven-hour day. (Round your answers to 1 decimal place.) The minimum cycle time seconds The maximum cycle time seconds c. Determine the minimum number of workstations for output of 500 units per day. (Round up your answer to the next whole number.) Minimum number of workstations d. Balance the line using the greatest positional weight heuristic. Break ties with the most following tasks heuristic. Use a cycle time of 50 seconds. Work stationsFollowing Tasks I (Click to select) D E B C A II (Click to select) F C A D B III (Click to select) A, E, C A C B B, E, C IV (Click to select) G, H C G F, A, G G, F, H, I V (Click to select) J B A D C e. Calculate the percentage idle time for the line using the 50 second cycle time. (Round your answer to 1 decimal place. Omit the "%" sign in your response.) Percentage of idle time % Problem 6-3 A manager wants to assign tasks to workstations as efficiently as possible, and achieve an hourly output of 4 units. The department uses a working time of 56 minutes per hour. Assign the tasks shown in the accompanying precedence diagram (times are in minutes) to workstations using the following rules: a. In order of most following tasks. Tiebreaker: greatest positional weight. Work StationTasks I (Click to select) A, G I E, H D, B, C F, A, G II (Click to select) E, H I F, A, G D D, B, C III (Click to select) E, H I H F, A, G D, B, C IV (Click to select) F, A, G E, H B,E I H b. In order of greatest positional weight. Work StationTasks I (Click to select) C, D F, D G, H D, C F, G II (Click to select) E, H G, A, B G, H F, A, G B, C III (Click to select) C, E A F, G B,E D, C, F IV (Click to select) B,E H H, I G A c. What is the efficiency? (Round your answer to 2 decimal places. Omit the "%" sign in your response.) Efficiency % 8-2 The owner of Genuine Subs, Inc., hopes to expand the present operation by adding one new outlet. She has studied three locations. Each would have the same labor and materials costs (food, serving containers, napkins, etc.) of $2.00 per sandwich. Sandwiches sell for $2.80 each in all locations. Rent and equipment costs would be $5,450 per month for location A, $5,725 per month for location B, and $5,975 per month for location C. a. Determine the volume necessary at each location to realize a monthly profit of $10,250. (Do not round intermediate calculations. Round your answer to the nearest whole number.) LocationMonthly Volume A B C b-1. If expected sales at A, B, and C are 24,250 per month, 21,250 per month, and 23,250 per month, respectively, calculate the profit of the each locations? (Omit the "$" sign in your response.) LocationMonthly Profits A$ B$ C$ b-2. Which location would yield the greatest profits? Location C Location B Location A

Show more Read less
Institution
Course

Content preview

Solution file




An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total time for all
tasks is 18 minutes. The line will operate for 450 minutes per day.

a. What are the minimum and maximum cycle times? (Round your answers to 1 decimal place.)




Minimum cycle time minutes

Maximum cycle time minutes


b. What range of daily output is theoretically possible for the line? (Round your answers to 1 decimal
place. Enter the smaller value in the first box and the larger value in the second box.)

Range of output to units/day

c. What is the minimum number of workstations needed if the maximum output rate is to be sought?
(Round up your answer to the next whole number.)

Minimum number of workstations

d. What cycle time will provide an output rate of 125 units per day? (Round your answer to 1 decimal
place.)

Cycle time min/cycle

e. What output potential will result if the cycle time is (1) 9 minutes? (2) 15 minutes?


Cycle TimePotential Output

(1) units

(2) units

Solutio
n:
OT = 450 minutes
a. Minimum cycle time = length of longest task, which is
2.4 minutes. Maximum cycle time =  task times =
18minutes.
b. Range of output:
450
@ 2.4 min.:  187.5 units
2.4
450
@18 min.:

25
unit

, s
18
Dx t 187.5(18)
c. N   7.5, which rounds to8
OT 450
d. Output 450
OT Solving for CT, CT   3.6 minutes per
 cycle 125
CT

Written for

Institution
Course

Document information

Uploaded on
November 1, 2019
Number of pages
8
Written in
2019/2020
Type
Answers
Person
Unknown

Subjects

$18.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StuviaGuides West Virgina University
Follow You need to be logged in order to follow users or courses
Sold
16208
Member since
7 year
Number of followers
8363
Documents
5980
Last sold
15 hours ago
Accounting, Finance, Statistics, Computer Science, Nursing, Chemistry, Biology & More — A+ Test Banks, Study Guides & Solutions

As a Top 1st Seller on Stuvia and a nursing professional, my mission is to be your light in the dark during nursing school and beyond. I know how stressful exams and assignments can be, which is why I’ve created clear, reliable, and well-structured resources to help you succeed. I offer test banks, study guides, and solution manuals for all subjects — including specialized test banks and solution manuals for business books. My materials have already supported countless students in achieving higher grades, and I want them to be the guide that makes your academic journey easier too. I’m passionate, approachable, and always focused on quality — because I believe every student deserves the chance to excel.

Read more Read less
4.3

2295 reviews

5
1571
4
305
3
184
2
74
1
161

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions