Tentamen (uitwerkingen)

Bcn3027 Exam | with 100% Correct Answers| Latest Update 2024

Beoordeling
-
Verkocht
-
Pagina's
7
Cijfer
A+
Geüpload op
29-08-2024
Geschreven in
2024/2025

List the stages of design and their status of completion. - ANSWER preliminary design (0 to 15%), schematic design (15 to 30%), design development (30 to 60%), construction documents (60 to 100%) How are conflicts between drawings and specifications resolved? - ANSWER no hierarchy unless order of precedence clause assigns priority, all in all read the contract

Meer zien Lees minder
Instelling
Bcn
Vak
Bcn

Voorbeeld van de inhoud

Bcn3027 Exam | with 100% Correct
Answers| Latest Update 2024


List the stages of design and their status of completion. - ANSWER preliminary design
(0 to 15%), schematic design (15 to 30%), design development (30 to 60%),
construction documents (60 to 100%)



How are conflicts between drawings and specifications resolved? - ANSWER no
hierarchy unless order of precedence clause assigns priority, all in all read the contract



What are the 4 main types of project delivery methods? - ANSWER design bid
build, design build, CM at risk, CM agency



What are the advantages and disadvantages of design bid build? - ANSWER advantage
= competitive, most familiar, cost known upfront
disadvantage = takes longest, no constructability input, expensive change orders



What are the advantages and disadvantages of design build? - ANSWER advantage
= best communication, contractor involved early

disadvantage = final cost unknown, owner left out of design decisions, no check
and balances



What are the advantages and disadvantages of construction management agency?
- ANSWER advantage = constructability input in design, fast-tracked, CM works for
owner's interests only
disadvantage = CM not at risk for any work, more fees

, What are the advantages and disadvantages of construction manager at risk? -
ANSWER advantage = constructability input in design, fast tracked
disadvantage = final cost unknown, trades involved later


What is the difference between lump sum and guaranteed maximum price? - ANSWER
GMP = maximum price owner will have to pay their contractor or subcontractor,
regardless of the actual costs incurred
lump sum = contractor agrees to complete the project for a predetermined, set price.



What are the 5 ways bids are solicited during procurement? - ANSWER open bid -
any and all
prequalified bid - only qualified
1 stage RFP - any and all
2 stage RFP/RFQ - only qualified
sole source - direct negotiation



What are the 4 types of selection during procurement? - ANSWER low bid - lowest is
accepted,
best value price - combo of price and non-price factors,
best value fees - combo contractor fee and non-price factors,
qualification - most comprehensive non-price factors



What are the steps of the bidding process? - ANSWER designer completes bid
package, owner solicits bid, contractors review and submit bids, owner analyzes and
makes award



What documents can be found in the bid package? - ANSWER instructions to bidders,
bidder questionnaire, bonding requirements, blank agreement, general and
supplementary conditions, construction drawings/specifications

Geschreven voor

Instelling
Bcn
Vak
Bcn

Documentinformatie

Geüpload op
29 augustus 2024
Aantal pagina's
7
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$11.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
KenAli West Virginia University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
94
Lid sinds
1 jaar
Aantal volgers
5
Documenten
17546
Laatst verkocht
3 dagen geleden

2.6

17 beoordelingen

5
2
4
4
3
4
2
0
1
7

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen