Certified Healthcare Constructor (CHC)
9) _______________ is a tool used to reduce large scale projects into small,
easy to manage parts. - -PDC process
- A level 1 dedicated WAGD source shall consist of ______or more
producers, each shall be sufficient to serve the peak calculated
demand. - -two
- According to NFPA 99-1999, to which branch of the essential electrical
system are the medical gas alarm panels connected: - -Life Safety
- According to the Life Safety Code, which of the following is correct in
regard to corridor walls in a sprinklered occupancy? - -The walls must limit
transfer of smoke
- Acute is to ambulatory as... - -inpatient is to outpatient
- Before an employee enters a permit-required confined space, the
internal atmosphere shall be tested with a calibrated direct-reading
instrument for oxygen content and which of the following? - -potential
toxic air contaminants, and flammable gases and vapors
- Corridor doors in a one hour smoke barrier must meet the following
minimum requirements? - -20 minute label, self-closing with non-latching
hardware
- Does a general hospital or an ACC have a higher patient acuity? Why? -
-General hospital because it has an ER and an ICU. Ambulatory hospitals
are outpatient hospitals.
- Does a laundry room belong on the Critical Branch of the Essential
Electrical System in a Patient Care area ? - -No
- Does an MRI machine use radiation to produce its images? - -No, it
uses magnetic and radio frequencies
- Does an ultrasound use radiation to produce its images? - -No, it uses
sound waves
- Does the NITC address the qualification of med gas piping inspectors? -
-No
- During an ILSM the Hospital Safety department
is required to conduct additional fire drills how
often? - -Once per shift per quarter
, - For the DOH book, certified subcontractor completion letters should
have all of the following 4 attributes - -a) Typed on subs company
letterhead
c) Notarized, signed and dated
d) File number
e) Index number
- How long does fire watch need to be implemented during hot work? - -
Fire watch must be implemented until the hot work permit is closed out
- How many people die a year from hospital
acquired infections (HAI's) - -99,000
- How many receptacles are required at a patient bed location
(headwall) in a General Care area? Critical Care area? - -8 & 14
- How many smoke compartments must a floor have if it is somewhere
that patients sleep or patients are treated? - -2 according to NFPA 101-
2000
- How often are exits checked during an ILSM condition? - -Daily
- How often should alternate exits caused by an ILSM plan be inspected
during construction? - -Daily
- How often should fire extinguishers be inspected at an HCF? - -Monthly
- If you fail the inspection how long must you typically wait before DOH
will come back out? - -4 weeks
- In an Existing Facility, that is sprinklered, corridor doors must be able
to resist X pounds of pressure from the latch side of the door? - -5 pounds
- In positive pressure systems, area alarm sensors for vital life support
and critical care areas shall be located on which 3 sides side of the
zone valve box assemblies? - -patient room, outlet/inlet, and downstream
- Is a facility in bad shape if it has a high FCI number? - -Yes
- Is lead shielding required when constructing an MRI room? - -No, no
radiation is involved in the imaging process
- Is self latching hardware required at doors within openings that are
part of the smoke barrier? - -No
- Is temporary signage a required component in maintaining patient
safety during construction? - -No
9) _______________ is a tool used to reduce large scale projects into small,
easy to manage parts. - -PDC process
- A level 1 dedicated WAGD source shall consist of ______or more
producers, each shall be sufficient to serve the peak calculated
demand. - -two
- According to NFPA 99-1999, to which branch of the essential electrical
system are the medical gas alarm panels connected: - -Life Safety
- According to the Life Safety Code, which of the following is correct in
regard to corridor walls in a sprinklered occupancy? - -The walls must limit
transfer of smoke
- Acute is to ambulatory as... - -inpatient is to outpatient
- Before an employee enters a permit-required confined space, the
internal atmosphere shall be tested with a calibrated direct-reading
instrument for oxygen content and which of the following? - -potential
toxic air contaminants, and flammable gases and vapors
- Corridor doors in a one hour smoke barrier must meet the following
minimum requirements? - -20 minute label, self-closing with non-latching
hardware
- Does a general hospital or an ACC have a higher patient acuity? Why? -
-General hospital because it has an ER and an ICU. Ambulatory hospitals
are outpatient hospitals.
- Does a laundry room belong on the Critical Branch of the Essential
Electrical System in a Patient Care area ? - -No
- Does an MRI machine use radiation to produce its images? - -No, it
uses magnetic and radio frequencies
- Does an ultrasound use radiation to produce its images? - -No, it uses
sound waves
- Does the NITC address the qualification of med gas piping inspectors? -
-No
- During an ILSM the Hospital Safety department
is required to conduct additional fire drills how
often? - -Once per shift per quarter
, - For the DOH book, certified subcontractor completion letters should
have all of the following 4 attributes - -a) Typed on subs company
letterhead
c) Notarized, signed and dated
d) File number
e) Index number
- How long does fire watch need to be implemented during hot work? - -
Fire watch must be implemented until the hot work permit is closed out
- How many people die a year from hospital
acquired infections (HAI's) - -99,000
- How many receptacles are required at a patient bed location
(headwall) in a General Care area? Critical Care area? - -8 & 14
- How many smoke compartments must a floor have if it is somewhere
that patients sleep or patients are treated? - -2 according to NFPA 101-
2000
- How often are exits checked during an ILSM condition? - -Daily
- How often should alternate exits caused by an ILSM plan be inspected
during construction? - -Daily
- How often should fire extinguishers be inspected at an HCF? - -Monthly
- If you fail the inspection how long must you typically wait before DOH
will come back out? - -4 weeks
- In an Existing Facility, that is sprinklered, corridor doors must be able
to resist X pounds of pressure from the latch side of the door? - -5 pounds
- In positive pressure systems, area alarm sensors for vital life support
and critical care areas shall be located on which 3 sides side of the
zone valve box assemblies? - -patient room, outlet/inlet, and downstream
- Is a facility in bad shape if it has a high FCI number? - -Yes
- Is lead shielding required when constructing an MRI room? - -No, no
radiation is involved in the imaging process
- Is self latching hardware required at doors within openings that are
part of the smoke barrier? - -No
- Is temporary signage a required component in maintaining patient
safety during construction? - -No