with Answers
1. Phase 1 equipment is related to all of the following except: - Correct Answer
Dispenser mounted vapor recovery equipment- PEI 300 P.7 (3.1)
2. According to EO VR-201/202-N, the only authorized hose configuration is: -
Correct Answer Any hose configuration- EO VR 202-N Exhibit 2 P.2
3. The most current ARB approved Phase 2 vapor recovery is: - Correct Answer
EVR - EO VR-202-N P.1
4. When certified Healy Technician is replacing the VP 1000 during operational
hours, they should do all of the following to eliminate potential problems except: -
Correct Answer Review service with the gas station operator - IOM Healy
Phase 2 P.42-53
5. The following component is not part of the Healy Phase 2 vapor recovery system:
- Correct Answer Healy Model 900 Vapor Motor - EO VR-202-N Exhibit 1 P.2
6. The max dispensing flow rate of a Healy 900 series EVR nozzle is: - Correct
Answer 10 GPM - IOM Healy Phase 2 EVR P.7 (1.2.3)
7. According to VR - 201/202 - N, a ________________ should be installed on the
Healy system if the flow rate is above 10 GPM - Correct Answer Flow Limiter
EO VR-202-N Exhibit 2 P.2
8. The Quarterly Inspection and Testing of a Healy Phase 2 EVR system should
include the following except: - Correct Answer Conduct a pressure decay test
by a Healy Certified technician - IOM Healy Phase 2 P.7 (1.2)
9. The first sign of oxygen depletion is: - Correct Answer Accelerated breathing
and heartbeat - EPA 910 P.55
10. According to PEI 500, each of the following are proper methods of removing a
portion of GDF from service except: - Correct Answer Noting event in the
defective equipment log - PEI 500 9.2.2 P.26
11. What procedure checks the integrity of the vapor check valve in the nozzle? -
Correct Answer Nozzle bag test - IOM Healy Phase 2 P.9 (1.4.4) or EO VR-
202-N Exhibit 7