Phase I equipment is related to all of the following except:
Product delivery to the tanks
Dispenser mounted vapor recovery equipment
Recovery of vapors during tanker truck deliveries
Spill buckets - Correct Answer Product delivery to the tanks
Dispenser mounted vapor recovery equipment
Recovery of vapors during tanker truck deliveries
Spill buckets
According to EO VR-201/202-N, the only authorized hose configuration is:
Lazy-Q
Lazy J
Curly-J
Any Hose Configuration - Correct Answer Lazy-Q
Lazy J
Curly-J
Any Hose Configuration
The most current ARB approved Phase II vapor recovery is:
ORVR
EVR
ISD
,UDC - Correct Answer ORVR
EVR
ISD
UDC
When a certified Healy Technician is replacing the VP 1000 during operational hours,
they should do all of the following to eliminate potentials problems except:
Barricade the area
Not smoking or allow open flames in the area
Wear eye protection
Review service with gas station operator - Correct Answer Barricade the area
Not smoking or allow open flames in the area
Wear eye protection
Review service with gas station operator
The following component is not part of the Healy Phase II vapor recovery system?
Healy Model 900 Nozzle
Healy Model VP 1000 Vacuum Pump
Healy Model 900 Vapor Motor
Healy Model 8701VV Breakaway Coupling - Correct Answer Healy Model 900 Nozzle
Healy Model VP 1000 Vacuum Pump
Healy Model 900 Vapor Motor
Healy Model 8701VV Breakaway Coupling
The max dispensing flow rate of a Healy 900 Series EVR nozzle is?
6.5 GPM
5 GPM
,10 GPM
9.5 GPM - Correct Answer 6.5 GPM
5 GPM
10 GPM
9.5 GPM
According to VR-201/202-N, a ______________should be installed on the Healy
system if the flow rate is above 10 GPM
breakaway
flow limiter
pressure vacuum valve
product reducer - Correct Answer breakaway
flow limiter
pressure vacuum valve
product reducer
The Quarterly Inspection and Testing of a Healy Phase II EVR system should include
the following except:
weekly Inspection
check Clean Air Separator for proper operating configuration
conduct a pressure decay test by a Healy Certified Technician
nozzle timings - Correct Answer weekly Inspection
check Clean Air Separator for proper operating configuration
conduct a pressure decay test by a Healy Certified Technician
nozzle timings
The first sign of oxygen depletion is:
, nausea
rapid fatigue
accelerated breathing and heartbeat
labor breathing - Correct Answer nausea
rapid fatigue
accelerated breathing and heartbeat
labor breathing
According to PEI 500, each of the following are proper methods of removing a portion of
a GDF from service except:
placing an Out-of-Service bag on a specific nozzle
noting event in the defective equipment log
removing power using the circuit breaker
wrapping CAUTION tape completely around the dispenser - Correct Answer placing an
Out-of-Service bag on a specific nozzle
noting event in the defective equipment log
removing power using the circuit breaker
wrapping CAUTION tape completely around the dispenser
What procedure checks the integrity of the vapor check valve in the nozzle?
Dynamic back pressure test
Pressure decay test
Nozzle bag test
TP-201B - Correct Answer Dynamic back pressure test
Pressure decay test
Nozzle bag test