Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Beoordeling
-
Verkocht
-
Pagina's
5
Cijfer
A+
Geüpload op
14-09-2024
Geschreven in
2024/2025

Construction Jobsite Management 4th Edition By William R. Mincks; Hal Johnston Solutions Manual

Instelling
Vak

Voorbeeld van de inhoud

Construction Jobsite Management 4th Edition By
William R. Mincks; Hal Johnston Solutions Manual

Traditional system of construction management is also named in the text as -
ANSWER: Design-Bid-Build

The text refers to four basic project delivery systems - ANSWER: design build,
design-bid-build,
cm agency,
and cm at risk

The three primary contractual principal parties involved are the: - ANSWER: owner,
architect, and contractor

The texts lists several bidding procedures and contracts for CMs to obtain work. List
three: - ANSWER: competitive, negotiated, unit price

The contract documents can be broken down many different ways. The text breaks
them down into two major components: - ANSWER: project manual and
construction drawings

How does the book define the word addenda: - ANSWER: bulletins of additional
information that germane to the contract documents issued during the bid period

What division is the AIA A201 form found in, and what purpose does it serve? -
ANSWER: General conditions; it establishes the relationships, responsibilities, and
legal terms between parties

The technical specifications include divisions 2-16, list half of the divisions: -
ANSWER: 02 sitework
03 concrete
04 masonry
05 metals
06 woods, plastics, and composites
07 thermal and moisture protection
08 openings
09 finishes
10 specialties

There are several different uses for submittals on a jobsite. Which of the following is
not considered one of the 5 uses for submittals during the construction process? -
ANSWER: Cost schedule and contractual payment obligations for materials

Which of the following items is a factor that applies to determining the necessary
time frame for approval of submittals? - ANSWER: All of the above (complexity of the

, submittal, size of the submittal package, number of consultants reviewing a
submittal)

T/f shop drawings are the set of drawings prepared by the architect or owner for the
contractor to supply materials. - ANSWER: false

After subcontracts and purchase orders are completed, who is the first person to
review a submittal once they are submitted? - ANSWER: The general contractor

t/f when reviewing submittals, the engineer is permitted to add or delete any
information as necessary - ANSWER: TRUE:

List three of the six keys to effective jobsite documentation and communication: -
ANSWER: truthfulness, timeliness, distribution, uniformity, completeness, and
objectivity

List the six primary areas which need to be covered by documents? - ANSWER:
Events, conversations, costs, correspondence, contractual requirements, and
meeting minutes

Which of the following statements is not true about RFIs? - ANSWER: Phone
conversations are an acceptable way to send RFIs

Which of the following items is not one of the five main elements in the
documentation of a correspondence between parties? - ANSWER: None of the above
(reference to project name, description and location of the subject, summary of
correspondence, signature)

t/f pre printed forms are not useful tools for a construction jobsite office because
each job is unique. - ANSWER: false

With respect to jobsite meetings, all of the following are considered guidelines for
what should be recorded expect: - ANSWER: note of upcoming holidays (these
should be included: agenda and meeting minutes, list of attendees, review of work
done on site, and safety related events/concerns on site)

Which of the following general contractor personnel will not typically attend a
jobsite construction progress meeting? - ANSWER: Estimator (these people will:
superintendent, field engineer, project manager, and foreman)

t/f specialized meetings happen more frequently than other meetings, because they
are generally less time consuming and involve simple answer. - ANSWER: false

According to the book, pre-job planning involves 5 major organization sections. List
below: - ANSWER: review staffing requirements, review of the estimate/estimators
intent, development of the construction plan/prelim schedule, project safety

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
14 september 2024
Aantal pagina's
5
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
kushboopatel6867
5.0
(1)

Maak kennis met de verkoper

Seller avatar
kushboopatel6867 Chamberlain College Nursing
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
3
Lid sinds
1 jaar
Aantal volgers
0
Documenten
1282
Laatst verkocht
8 maanden geleden
EXCELLENT HOMEWORK HELP AND TUTORING ,

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why i'm one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Lees meer Lees minder
5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen