Which of these would an interior designer put into a schedule?
hardware
finish
door/ window
all of the above ** Answ** all of the above
On an electrical plan, what does the following symbol represent?
duplex outlet
double switch
dimmer switch
3-way switch ** Answ** dimmer switch
On what sheet of a construction drawing set would be the most logical location for the door
schedule?
On the partition plan
On the title sheet with the general notes
On the details sheet
None of these ** Answ** On the partition plan
What mark is placed on a floor plan to indicate that an elevation of a wall or walls is drawn
somewhere in the drawing set?
an elevation reference
reference bubble
a detail reference
a section reference ** Answ** an elevation reference
,Which symbol represents a quadruplex outlet?
A
B
C
D ** Answ** C
A quadruplex receptacle is represented by 2 perpendicular lines crossing through a standard
duplex symbol.
The top number inside each symbol refers to what in a set of working construction documents?
** Answ** Indicates the sequential drawing number
Which of the following drawings would be most needed to begin space planning in an existing
building?
circulation plan
egress plan
reflected ceiling plan
base plan ** Answ** base plan
What does this symbol represent?
Telephone
Data
Power and data
Data and telephone ** Answ** Data and telephone
What does this symbol represent? ** Answ** Telephone jack
What symbol is represented by an open triangle? ** Answ** Data jack
Which type of drawing is used to show items that are up to 48" (1.2 m) AFF?
,floor plan
axonometric
orthographic projection
elevation ** Answ** floor plan
Which millwork finish would be the best choice to use for the front desk that takes a lot of abuse
in a very busy hotel lobby?
polyurethane
stain
polyester
lacquer ** Answ** polyurethane
For many different reasons in a construction project the final space may be different from the
space reflected in the original construction drawings. When this happens what type of document
must be produced and given to the client?
revised construction drawings
no new documents are necessary
as-built drawings
redlined drawings ** Answ** as-built drawings
Which of the following is not typically required by the AHJ to appear on the first sheet of the
drawing set?
Construction type and occupancy group or groups
The number of occupants to be accommodated on every floor and in all rooms and spaces
The valuation of the new construction represented by the plans and specifications
Area of the space designed ** Answ** The number of occupants to be accommodated on
every floor and in all rooms and spaces
, A dead-end corridor may not exceed how many feet in a sprinklered building?
50 feet (15240 mm)
20 feet (6096 mm)
30 feet (9144 mm)
25 feet (7620 mm) ** Answ** 50 feet (15240 mm)
A dead-end corridor may not exceed how many feet in a non-sprinklered building?
50 feet (15240 mm)
20 feet (6096 mm)
30 feet (9144 mm)
25 feet (7620 mm) ** Answ** 20 feet (6096 mm)
Furniture plans can typically be doubled with which two plans since the exact locations of outlets
can be directly related to the location and orientation of furniture?
RCP and Finish Plan
Power and Communications
Finish schedule and Site
Telephone and AV directory ** Answ** Power and Communications
You have designed a custom entry wall feature behind the reception desk of a commercial office
tenant.
The wall will receive a matte flat paint finish with a high gloss backlit oversized logo across the
length of the wall. Which of the following is a critical note to include for the success of this
design element?
This wall to receive a Level 0 finish. Refer to elevation for extent of plywood blocking.
This wall to receive a Level 3 finish with the wallboard applied vertically along entire wall.