Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

FDNY COF P-98 EXAM AND PRACTICE EXAM ACTUAL EXAM 275 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED

Beoordeling
5.0
(1)
Verkocht
-
Pagina's
8
Cijfer
A+
Geüpload op
27-09-2024
Geschreven in
2024/2025

FDNY COF P-98 EXAM AND PRACTICE EXAM ACTUAL EXAM 275 QUESTIONS AND CORRECT DETAILED ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED

Instelling
Vak

Voorbeeld van de inhoud

FDNY COF P-98 EXAM AND PRACTICE EXAM ACTUAL
EXAM 275 QUESTIONS AND CORRECT DETAILED
ANSWERS (VERIFIED ANSWERS) |ALREADY GRADED
A fill line in an oil burner system is a line used to: - ANSWER: Fill the storage tank
with oil.

The aquastat is located - ANSWER: Below the water line.

All heating, combustion, and cooking equipment shall be installed with adequate
clearances from _______ construction. - ANSWER: Combustible

The equipment must be provided with ______ or the building construction shall be
_____ _____. - ANSWER: Insulation.
Fire Protected

During operation the surface of combustible construction materials will not be raised
to a temp higher than _____ degrees F. - ANSWER: 170 degrees

Equipment shall be so that the means of access for ordinary operation and
maintenance will not be _______. - ANSWER: Hazardous

Acceptance Tests:
Boilers shall not be placed in operation until they have been _____ and ____ and an
equipment ____ _____ has been issued by the ______. - ANSWER: Inspected and
tested.
Use permit, commissioner

Periodic Inspections: All boilers must be inspected at least _____ a _____ including
chimney connections. - ANSWER: Once a year

Owners Annual Statement: The owner of each boiler shall file an _____ written
statement with the ________, specifying the _____of each boiler and ______ for
inspection. - ANSWER: Annual, commissioner, location, arrangement.

Field Tests: all piping and oil storage tanks shall be _______ tested for tightness by
the ______ before the system is operated. - ANSWER: Hydrostatically, contractor

The piping shall be tested at _____ times the max working pressure applicable to
that part of the piping system but at a pressure ____ than the test pressure required
for the storage tank. - ANSWER: 1/2, less

The min pressure for testing tanks shall be ____ times the max working pressure but
in no case less than ____ psi. - ANSWER: 1 1/2, 25 psi

, The hydrostatic pressure must be maintained until all ____ and _____ have been
visually inspected for ___, but in no case less than _____ hour. - ANSWER: Joints,
connections, leaks, 1/2 hour.

A record must be kept of the pressure test showing the name of the _____ and the
_____ at which the piping and tank were tested. - ANSWER: Contractor, pressure

Gas piping must be tested by the _____ before operation. - ANSWER: Contractor

For oil burning systems, ____ ____ giving instructions for the care and operation of
the system shall be permanently located in an easily _____ and _____ location near
the equipment. - ANSWER: Instruction Cards, visible, accessible

No oil burning equipment shall be operated until an equipment ____ _____ has been
issued by the commissioner, the requirements of the ____ ____ control code have
been met and until the approval for the storage of ____ ____ has been given by the
fire commissioner. - ANSWER: Use permit, air pollution, fuel oil

Every oil burning installation that is not fully automatic or requires preheating shall
be operated under the direct supervision of a person holding a ____ ___ ______
issued by the FD. - ANSWER: COF

Such person must be in the building at ____ ____ while in operation and present in
the _____ _____ during startup. - ANSWER: All times, boiler room

After any repairs to the boiler are made, ______ shall check the repairs and the
functioning of all ____ _____ and the positioning of the ______. - ANSWER:
Operators, control devices, valves

All heating and combustion equipment that is fired with solid, liquid, or gas fuels,
must comply with the requirements of the ____ _____ _____ code. - ANSWER: Air
pollution control

Low Temp Equipment have a temp of ____ degrees at the point of leaving the
equipment. - ANSWER: 600 or less

Median Temp Equipment have a temp of between ___ and ___ degrees F at the
point of leaving the equipment under normal conditions. - ANSWER: 600 and 1000

High Temp Equipment have a temp of ____ or ____ degrees F leaving the
equipment. - ANSWER: 1000 or greater

Ventilation shall be capable of providing at least ____ cfm of air for each gallon of oil
per ____. - ANSWER: 36, hour

Gekoppeld boek

Geschreven voor

Vak

Documentinformatie

Geüpload op
27 september 2024
Aantal pagina's
8
Geschreven in
2024/2025
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$18.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF


Ook beschikbaar in voordeelbundel

Beoordelingen van geverifieerde kopers

Alle reviews worden weergegeven
1 jaar geleden

5.0

1 beoordelingen

5
1
4
0
3
0
2
0
1
0
Betrouwbare reviews op Stuvia

Alle beoordelingen zijn geschreven door echte Stuvia-gebruikers na geverifieerde aankopen.

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
tutorsectionn Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
34
Lid sinds
1 jaar
Aantal volgers
2
Documenten
842
Laatst verkocht
4 maanden geleden
EXCELLENT HOMEWORK

EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A EXCELLENT HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A Am an expert on major courses especially; psychology,Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that\'s why i\'m one of the BEST GOLD RATED TUTORS in STUVIA. I assure a GOOD GRADE if you will use my work.

Lees meer Lees minder
4.8

747 beoordelingen

5
616
4
96
3
21
2
8
1
6

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen